Original source · versioned page text
2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Attachments 1 & 2 to Item 7
Planning & Environment Committee Agenda
11 July 2017
ATTACHMENT 1
TRANSPORT NETWORK FUTURE PROJECTS
FOR
LGIP - SCHEDULE OF WORKS (SOW)
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 20 (of 43)
Section 2
Introduction
Noosa Shire Council was reformed following the de-amalgamation of a number Queensland
local government areas in January 2014 with the immediate priority being to uptake the day
to day operational requirements by a local government.
The primary considerations made in undertaking the review of the Transport network for
updating the current PIP to a LGIP were discussed at the LGIP workshop for Councillors
held on 19 January 2017 and detailed in the report to Council of 7 February 2017 and
adopted on 16 February 2017 on the Desired Standards of Service (DSS). This provided
information, details and outcomes for progressing the Transport network component of the
LGIP as follows:
i. The current Statutory Guideline 03/04 advocates:
• a single “transport” network containing road, pathway & public transport
infrastructure components rather than 3 individual networks; and
• “trunk” infrastructure is now generally contained in the “trunk” road corridors (or to
a specific destination/facility) as contained in Appendix B of the Guideline detailing
indicative trunk infrastructure.
ii. The resulting DSS amendments adopted by Council for the Transport network:
• updated references to current design and construction standards & specifications;
• clarified that “trunk” infrastructure for the Transport network is generally
considered:
o to align within (or adjacent to) “trunk” road corridors;
o to provide main through linkage connections; and
o to specific high use destinations and facilities.
iii. The PFTI future works to be primarily based on:
• any 2014-2016 trunk type projects completed;
• Road “trunk” future works based on:
o Noosa Traffic Study to 2036 recommendations;
o major proposed upgrades in capital works program; and
o to identify Main Roads controlled roads issues.
• Pathway “trunk” future works based on:
o identified missing links; and
o major “trunk” path upgrades in capital works program.
• Bus stop “trunk” future works based on:
o Council’s Passenger Transport Accessible Infrastructure Program (PTAIP).
The following tables provide details of the future projects proposed for the LGIP in
accordance with the above criteria. This is an interim measure until further amendments can
be made and incorporated in a subsequent LGIP to be prepared for the new Planning
Scheme that reflects Council’s further network planning.
For projects that have an associated renewal component, this will be highlighted and
accounted for in the Schedule of Works (SOW) excel model.
2
Section 3
1. Road Future Projects
Project Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis
ID Timing Estimate
• 1516T017 Dr Pages Road
Dr Pages Rd / Kinmond Creek • Upgrade gravel road sections to sealed and Kinmond Creek Road
Road upgrade, sealing &
R-1 Rd standard 2014-2016 $4,659,830 Upgrade Construction
improvement in flood immunity
(Cootharaba) • PIP (16 September 2013) • Capital Works
Program2015-2016
• 1617T112 Kinmond Creek -
Kinmond Creek Rd Sandy Creek & Eastern Branch Creek • 1617T112 Kinmond Creek - Council Council Report v5
R-2 2016-2021 $1,601,732
(Cootharaba) culvert and road capital reconstruction Report v5 • Capital Works Program
2017-2018
Ernest St / Hilton Tce • Extract - 5 Year Capital
R-3 Upgrade T intersection to roundabout • Noosa Traffic Study to 2036 2016-2021 $3,000,000
(Tewantin) Works Program 2017-2019
Poinciana Ave / Moorindil St • Cost Estimate – Attachment
R-4 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2016-2021 $568,224
(Tewantin) R-5
Memorial Ave / Doonella St • Cost Estimate – Attachment
R-5 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2016-2021 $568,224
(Tewantin) R-5 (Similar project scope)
Gibson Rd / Eumundi Noosa • Cost Estimate – Attachment
R-6 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2016-2021 $568,224
Rd (Noosaville) R-5 (Similar project scope)
Butler St / Poinciana Ave • Cost Estimate – Attachment
R-7 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2016-2021 $568,224
(Tewantin) R-5 (Similar project scope)
Heron St / David Low Way • Cost Estimate – Attachment
R-8 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2021-2026 $568,224
(Peregian Beach) R-5 (Similar project scope)
David Low Way / Lowry St / • Extract - 5 Year Capital
Upgrade 4 way intersection to
R-9 Peregian Esplanade • Noosa Traffic Study to 2036 2021-2026 $3,000,000 Works Program 2017-2019
roundabout
(Peregian Beach) (similar project scope to R-4)
Walter Hay Dr / Eenie Creek • Cost Estimate – Attachment
R-10 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2021-2026 $568,224
Rd (Noosaville) R-5 (similar project scope)
Walter Hay Dr / Eumundi • Cost Estimate – Attachment
R-11 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2021-2026 $568,224
Noosa Rd (Noosaville) R-5 (similar project scope)
• Eenie Creek Road Stage
3_7009-11-Overall Estimate
(June 2006) (assumed
Ben Lexcen Dr / Eenie Creek
R-12 Upgrade signalised intersection • Noosa Traffic Study to 2036 2021-2026 $1,443,600 similar project scope to
Rd (Sunshine Beach)
original intersection +
signalling components
indexed to 2014 base date)
Eumundi Noosa Rd / Eenie • Cost Estimate – Attachment
R-13 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2021-2026 $568,224
Creek Rd (Noosaville) R-5 (similar project scope)
Reef St / Mary St • Cost Estimate – Attachment
R-14 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2021-2026 $568,224
(Noosaville) R-5 (similar project scope)
3
Section 4
Project Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis
ID Timing Estimate
• 2-12-15 Opt 3 Goodchap
Eumundi Roundabout (Staff
Eumundi Noosa Rd /
R-15 Upgrade roundabout capacity • Noosa Traffic Study to 2036 2014-2016 $10,000 estimate of line-marking
Goodchap St (Noosaville)
component of road resealing
program 2015-2016)
• Cost Estimate (similar to
Mary River Rd Bridge,
Wapunga Lane (Bridge) Upgrade one lane bridge to two lane Cooroy - Attachment
R-16 • Upgrade to DSS for two lane road 2026-2031 $1,264,856
(Cootharaba) bridge re Safety Issues BRP_R3_Proposal_Form_M
ary River Road Bridge
Replacement FINAL)
Total = $20,094,034
Duplication of Beckmans Road • Noosa Demaining Agreement - April 2000
Beckmans Rd (Tewantin by-pass Eumundi Noosa • Submission on Draft State Infrastructure n/a
DTMR-1 2016-2021 DTMR project responsibility
(Tewantin) Rd - Cooroy Noosa Rd) including Plan – Noosa Council December 2015 by DTMR
intersection upgrades • Noosa Traffic Study to 2036
• Submission on Draft State Infrastructure
Myall St / Elm St n/a
DTMR-2 Upgrade intersection capacity Plan – Noosa Council December 2015 2016-2021 DTMR project responsibility
(Cooroy) by DTMR
• Noosa Traffic Study to 2036
• Submission on Draft State Infrastructure
Diamond St / Elm St n/a
DTMR-3 Upgrade intersection capacity Plan – Noosa Council December 2015 2016-2021 DTMR project responsibility
(Cooroy) by DTMR
• Noosa Traffic Study to 2036
Pomona Kin Kin Rd Upgrade one lane bridge to two lane • Submission on Draft State Infrastructure n/a
DTMR-4 TBA DTMR project responsibility
(Six Mile Creek) bridge re Safety Issues Plan – Noosa Council December 2015 by DTMR
Pomona Kin Kin Rd Upgrade one lane bridge to two lane • Submission on Draft State Infrastructure n/a
DTMR-5 TBA DTMR project responsibility
(Kin Kin Creek, West Branch) bridge re Safety Issues Plan – Noosa Council December 2015 by DTMR
Pomona Kin Kin Rd Upgrade one lane bridge to two lane • Submission on Draft State Infrastructure n/a
DTMR-6 TBA DTMR project responsibility
(Kin Kin Creek, Kin Kin) bridge re Safety Issues Plan – Noosa Council December 2015 by DTMR
Pomona Kin Kin Rd Upgrade one lane bridge to two lane • Submission on Draft State Infrastructure n/a
DTMR-7 TBA DTMR project responsibility
(Yellow Creek) bridge re Safety Issues Plan – Noosa Council December 2015 by DTMR
Pomona Kin Kin Rd Upgrade one lane bridge to two lane • Submission on Draft State Infrastructure n/a
DTMR-8 TBA DTMR project responsibility
(Kin Kin Creek) bridge re Safety Issues Plan – Noosa Council December 2015 by DTMR
List of Road Project Attachments:
1. Noosa Traffic Study to 2036
2. Noosa Demaining Agreement - April 2000
3. Submission on Draft State Infrastructure Plan – Noosa Council December 2015
4. Extract - 5 Year Capital Works Program 2017-2019
5. Cost Estimate R-5
6. 1516T017 Dr Pages Road and Kinmond Creek Road Upgrade Construction
7. 1617T112 Kinmond Creek - Council Report v5
8. 2-12-15 Opt 3 Goodchap Eumundi Roundabout
9. BRP_R3_Proposal_Form_Mary River Road Bridge Replacement FINAL
10. Eenie Creek Road Stage 3_7009-11-Overall Estimate (June 2006)
4
Section 5
2. Pathway Future Projects
Project Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis
ID Timing Estimate
• PIP (September 2013)
Lake Cooroibah Road, Connection from Mckinnon Drive to Cost estimate Att No.1
PW-1 • Provide Trunk path linkage connection 2021-2026 $683,964
Cooroibah Lake Cooroibah Length 2,700m
per Transport DSS
• PIP (September 2013)
Connection of missing Link to Town Cost estimate Att No.1
PW-2 Garnett Street, Cooroy • Provide Trunk path linkage connection 2015-2016 $168,880
Centre. Length 1,000m
per Transport DSS
• PIP (September 2013)
Swift Drive connection to Town Cost estimate Att No.1
PW-3 Swift Drive, Cooroy
Centre
• Provide Trunk path linkage connection 2026-2031 $371,536
Length 2,200m
per Transport DSS
• PIP (September 2013)
Lake Macdonald Drive, connection to Cost estimate Att No.1
PW-4 Lake Macdonald Drive, Cooroy
Botanic Gardens to Town Centre
• Provide Trunk path linkage connection 2026-2031 $227,988
Length 900m
per Transport DSS
Pathway upgrade and pedestrian • Provide Trunk path linkage connection Cost estimate Att No.1
PW-5 Hill Street, Sunshine Beach
safety improvements. per Transport DSS
2016-2021 $82,329
Length 325m
Heathland Drive, David Low Missing Link and Connections. • PIP (September 2013)
Cost estimate Att No.1
PW-6 Way, Edward street, Sunshine Pathway upgrade and pedestrian • Provide Trunk path linkage connection 2016-2021 $595,302
Length 2,350m
Beach safety improvements. per Transport DSS
David Low Way, Peregian Beach
David Low Way, Peregian pedestrian safety improvements and • Provide Trunk path linkage connection Att 2 David Low Way Ped
PW-7 Beach rufous street, Community centre per Transport DSS
2017-2018 $100,000
refuge.
connection to Village.
• PIP (September 2013)
David Low Way Peregian Beach shared pathway link Cost estimate Att No. 1
PW-8 • Provide Trunk path linkage connection 2026-2031 $272,319
(Peregian Beach) to Shire boundary Length 1,075m
per Transport DSS
• PIP (September 2013)
Queen Street Extension to Royal Cost estimate Att No.1
PW-9 Queen Street, Cooran
Court.
• Provide Trunk path linkage connection 2021-2026 $46,150
Length 320m
per Transport DSS
• PIP (September 2013)
Connection of missing Link from Cost estimate Att No.1
PW-10 Reserve Street, Pomona
Town Centre to Sports Park.
• Provide Trunk path linkage connection 2021-2026 $93,740
Length 650m
per Transport DSS
• PIP (September 2013)
Cost estimate Att No.1
PW-11 Hill Street, Pomona Connection of missing Link • Provide Trunk path linkage connection 2021-2026 $74,994
Length 520m
per Transport DSS
• PIP (September 2013)
Connection of missing Link to Public Cost estimate Att No.1
PW-12 Clay Street, Pomona
School
• Provide Trunk path linkage connection 2021-2026 $54,804
Length 380m
per Transport DSS
Park Road, Boardwalk Construction
• PIP (September 2013) ATT 3 Noosa Heads - Park Rd
PW-13 Park Road, Noosa Heads Upgrade Boardwalk from First Point 2016-2021 $6,500,000
• Capital Works Program 2017-2019 Boardwalk
to National Park
Noosa Parade Upgrade of Pathway • PIP (September 2013)
Cost estimate Att No.1
PW-14 Noosa Parade, Noosa Heads from Munna Point Bridge to Noosa • Provide Trunk path linkage connection 2021-2026 $689,030
Length 2,720m
Drive. per Transport DSS
5
Section 6
• PIP (September 2013)
Cost estimate Att No.1
PW-15 Rene Street, Noosaville Connection of missing Link • Provide Trunk path linkage connection 2021-2026 $48,131
Length 285m
per Transport DSS
• PIP (September 2013)
Cost estimate Att No.1
PW-16 Hoffman Drive, Noosaville Connection of missing Link • Provide Trunk path linkage connection 2021-2026 $33,776
Length 200m
per Transport DSS
• PIP (September 2013)
Seacove Court, Walter Hay Cost estimate Att No.1
PW-17 Connection of missing Link • Provide Trunk path linkage connection 2026-2031 $31,243
Drive, Noosaville Length 185m
per Transport DSS
• PIP (September 2013)
Connection of missing Link from Cost estimate Att No.1
PW-18 Gateway Drive, Noosaville • Provide Trunk path linkage connection 2014-2016 $39,687
Gateway Drive to Ventura Drive Length 235m
per Transport DSS
• PIP (September 2013)
Connection of missing Link Ventura Cost estimate Att No.1
PW-19 Ventura Drive, Noosaville • Provide Trunk path linkage connection 2026-2031 $80,218
Drive to Goodchap Street Length 475m
per Transport DSS
• PIP (September 2013)
Cost estimate Att No.1
PW-20 Moorindil Street, Tewantin Connection of missing Link to Ferry. • Provide Trunk path linkage connection 2026-2031 $78,529
Length 465m
per Transport DSS
• PIP (September 2013)
Att 5 Hilton Terrace Ernest
Connection of Missing Link from • Provide Trunk path linkage connection
PW-21 Hilton Terrace 2016-2021 $300,000 Street Intersection
Hilton Terrace and Ernest Street per Transport DSS
Improvements
• Capital Works Program
• PIP (September 2013)
Tewantin Foreshore pathway upgrade Att 4 Tewantin - Pathway &
• Provide Trunk path linkage connection
PW-22 Tewantin Foreshore and linkage from Town centre to Boat 2014-2016 $270,000 Lighting around Gallery &
per Transport DSS
Ramp Admin Bld
• Capital Works Program
Connection of Missing Link from • PIP (September 2013)
Cost estimate Att No.2
PW-23 Beckmans Road, Tewantin Noosaville State School to Cooroy • Provide Trunk path linkage connection 2026-2031 $607,968
Length 2,400m
Noosa Road. per Transport DSS
Total = $11,450,588
List of Pathway Project Attachments:
1. ATT 1 Cost Estimates
2. ATT 2 David Low Way, PEREGIAN - Pedestrian Refuge
3. ATT 3 Noosa Heads - Park Rd Boardwalk
4. Att 4 Tewantin - Pathway & Lighting around Gallery & Admin Bld
5. Att 5 Hilton Terrace Ernest Street Intersection Improvements
6
Section 7
3. Bus Stop Future Projects
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near Quamby Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301737 Ground Surface Indicators, pathway, 2014-2015 $40,000
Place • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near Lagoona Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301738 Ground Surface Indicators, pathway, 2014-2015 $40,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near Dolphin Infrastructure Program (PTAIP) 2014-15 $65,000 • Translink Funding
301764 Ground Surface Indicators, pathway, 2014-2015
Crescent • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near Dolphin Infrastructure Program (PTAIP) 2014-15 $50,000 • Translink Funding
301765 Ground Surface Indicators, pathway, 2014-2015
Crescent • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near William Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301766 Ground Surface Indicators, pathway, 2014-2015 $40,000
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Noosa Parade near William Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301767 Ground Surface Indicators, pathway, 2014-2015 $50,000
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Weyba Road near Gympie Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301768 Ground Surface Indicators, pathway, 2014-2015 $40,000
Terrace • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
Type C1-H shelter, hardstand, Tactile • Passenger Transport Accessible • PTAIP 2014-15 Projects List
David Low Way near Peregian Ground Surface Indicators, pathway, Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301786 2014-2015 $125,000
Esplanade kerb, rubbish bin, landscaping and J • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
Pole. 2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301805 Butler Street near Irene Street Ground Surface Indicators, pathway, 2014-2015 $50,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Infrastructure Program (PTAIP) 2014-15 • Translink Funding
301806 Butler Street near Irene Street Ground Surface Indicators, pathway, 2014-2015 $35,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
7
Section 8
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Weyba Road near Swan Infrastructure Program (PTAIP) 2014-15 • Translink Funding
302131 Ground Surface Indicators, pathway, 2014-2015 $50,000
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Weyba Road near Anchor Infrastructure Program (PTAIP) 2014-15 $65,000 • Translink Funding
302132 Ground Surface Indicators, pathway, 2014-2015
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Weyba Road near Swan Infrastructure Program (PTAIP) 2014-15 • Translink Funding
302133 Ground Surface Indicators, pathway, 2014-2015 $40,000
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2014-15 Projects List
Type C1-H shelter, hardstand, Tactile
Weyba Road near Swan Infrastructure Program (PTAIP) 2014-15 • Translink Funding
302134 Ground Surface Indicators, pathway, 2014-2015 $40,000
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2014-2015)
rubbish bin, landscaping and J Pole.
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Noosa Heads Bus Interchange Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301497 Tactile Ground Surface Indicators 2015-2016 $3,800
(Platform A) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Noosa Heads Bus Interchange Infrastructure Program (PTAIP) 2015-16 $3,800 • Translink Funding
301498 Tactile Ground Surface Indicators 2015-2016
(Platform B) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301504 Tewantin Central (RSL) Tactile Ground Surface Indicators 2015-2016 $1,800
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Remove Hedge, Concrete Infill,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301818 Poinciana Place Tactile Ground Surface Indicators and 2015-2016 $5,100
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bike hoops
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Pathway,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301740 Witta Circle Kerb and Tactile Ground Surface 2015-2016 $18,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Kerb and Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301752 Ely Park (Westbound) 2015-2016 $18,000
Tactile Ground Surface Indicators • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, Concrete Slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301753 Lions Park Pathway, Kerb and Tactile Ground 2015-2016 $55,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators
2015)
8
Section 9
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Seat,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301756 Ely Park (Eastbound) Pathway, Kerb and Tactile Ground 2015-2016 $17,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, Concrete Slab, Infrastructure Program (PTAIP) 2015-16 $23,000 • Translink Funding
302125 Mary St near Edward St Pathway, Bin, Kerb and Tactile • Bus Stop Prioritisation Spreadsheet (2014- 2015-2016 + Agreement (2015-2016)
Ground Surface Indicators 2015) $26,000 • Capital works project
• Shelter fully funded by Council initiation shelter H302125
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Seat,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302126 Mary St near Albert St Pathway, Bin, Kerb and Tactile 2015-2016 $19,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Ground Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Kerb and Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302169 Reserve St near Station Street 2015-2016 $16,000
Tactile Ground Surface Indicators • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Factory Street near Reserve Boarding platform, Tactile Ground Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302168 2015-2016 $19,000
Road Surface Indicators, seat, and kerb • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Eumundi Rd at Goodchap Concrete slab, kerb, Tactile Ground Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301743 2015-2016 $18,500
Street Surface Indicators, seat and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete slab, Tactile Ground Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301755 Quota Park 2015-2016 $17,000
Surface Indicators, move j pole, seat • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
Concrete slab, kerb , tree removal, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
reconstruct private fence, Tactile Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301821 Ward Park 2015-2016 $27,000
Ground Surface Indicators, pathway, • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
seat 2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Raised concrete boarding platform,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302165 Greenridge Pinbarren Rd Seat, Pathway, Pavement widening 2015-2016 $23,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
and Tactile Ground Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Concrete Boarding point, Seat,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302136 Weyba RD near Anchor Street Pathway, Kerb and Tactile Ground 2015-2016 $21,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Boarding platform, Tactile Ground
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302135 Weyba Rd near Swan St Surface Indicators, seat, bicycle hoop 2015-2016 $17,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
and kerb
2015)
9
Section 10
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Modify existing shelter, pathway, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302214 Moorindil St near Read St 2015-2016 $18,000
boarding platform, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R1 shelter, Concrete slab, kerb, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301598 Cooroy Railway Station 2015-2016 $60,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301733 Hibiscus Avenue (West) Tactile Ground Surface Indicators, 2015-2016 $61,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, line marking
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301734 Hibiscus Avenue (East) Tactile Ground Surface Indicators, 2015-2016 $58,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, retaining wall,
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4-P shelter, concrete slab, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301754 Massoud Park 2015-2016 $54,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4-P shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301758 James Duke Bridge kerb, Adjust SW pit lid, Tactile Ground 2015-2016 $56,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators and pathway
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301781 DLW at Peregian Beach Tactile Ground Surface Indicators, 2015-2016 $56,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, tree removal
2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
pathway, kerb, Tactile Ground Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301787 Peregian Beach Water Tower 2015-2016 $59,000
Surface Indicators, Pavement • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
rehabilitation, bin 2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301811 Tewantin Noosa Golf Club 2015-2016 $56,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301812 Tewantin Noosa Golf Club pathway, kerb, Tactile Ground 2015-2016 $56,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators, bin
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R2 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301959 Maple St near Myall St Tactile Ground Surface Indicators, 2015-2016 $60,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, pathway
2015)
10
Section 11
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
Type C1-H shelter, concrete slab, bin, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
concrete boarding platform, Tactile Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302108 Cooyar St near Ilangura St 2015-2016 $52,000
Ground Surface Indicators, and repair • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
pathway 2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301759 Lions Park 2015-2016 $56,500
kerb, pathway and rehabilitate bus • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bay. 2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
kerb, Tactile Ground Surface Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301782 Peregian North 2015-2016 $56,000
Indicators, bin, rock retaining wall and • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Pathway 2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301822 Ward Park Tactile Ground Surface Indicators, 2015-2016 $63,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, retaining wall, pathway
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, Concrete Slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302123 Mary st near Edward St Pathway, Bin, Kerb and Tactile 2015-2016 $23,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Ground Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R1 shelter, concrete slab, kerb, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301954 Ferrells Road near Myall St 2015-2016 $56,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301749 Robert Street Ground Surface Indicators, Pathway 2016-2017 $8,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
Raised concrete boarding platform, • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301750 The Cockleshell 2016-2017 $20,000
Pathway connection, Landscaping • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
and Seat 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301790 Woodland Drive Ground Surface Indicators, Pathway 2016-2017 $15,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Moorindil Street near George Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302215 2016-2017 $55,000
Street Pathway connection, Kerb ramp and • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
refuge. 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
319560 King Street near Prince Street 2016-2017 $20,000
Seat, Retaining wall. • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
2015)
11
Section 12
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type R1 Shelter, Slab, Tactile Ground
Tewantin Road near Olivine Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301962 Surface Indicators, Pathway 2016-2017 $52,000
Street (Eastbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection, retaining wall
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type R1 Shelter, Slab, Tactile Ground
Tewantin Road near Miva Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301963 Surface Indicators, Kerb, Pathway 2016-2017 $52,000
Street (Westbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection
2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Castaways Creek Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301581 2016-2017 $70,000
(Northbound) Pathway connection, Retaining wall • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
and Concrete indent bay 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Sunrise Beach Ground Surface Indicators, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301799 2016-2017 $80,000
(Northbound) connection, Kerb, and Concrete • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
indent bay 2015)
Type C2 Shelter, Slab, Tactile Ground • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Surface Indicators, Kerb, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301503 Tewantin Central (Westbound) 2016-2017 $70,000
connection, Pavement renewal, • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Embankment work 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301801 Vernon Street (Northbound) 2016-2017 $65,000
Pathway connection, Pavement • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
narrowing and recut table drain. 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301802 Vernon Street (Southbound) Pathway connection, Indent bay, • Bus Stop Prioritisation Spreadsheet (2014- 2016-2017 $75,000 Agreement (2016-2017)
embankment works and Concrete 2015)
indent bay
Type C4 Shelter, Slab, Tactile Ground • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Cooyar Street near Elanora Surface Indicators, Kerb, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302109 2016-2017 $90,000
Terrace connection, Adjustment of services, • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
revegetation of existing site. 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Bougainvillia Caravan Park Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301807 Ground Surface Indicators, Kerb, 2016-2017 $48,000
(Eastbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Bougainvillia Caravan Park Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301814 Ground Surface Indicators, Kerb, 2016-2017 $48,000
(Westbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301748 Gibson road Ground Surface Indicators, Pathway 2016-2017 $48,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection
2015)
12
Section 13
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Lake Weyba Drive near Creek Infrastructure Program (PTAIP) 2016-2017 $13,000 • Translink Funding
302121 Ground Surface Indicators, Pathway 2016-2017
Road • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302191 Pacific Ave Near Wildflower Ground Surface Indicators, Kerb, 2016-2017 $53,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302192 Pacific Ave Near Ferguson Ground Surface Indicators, Kerb, 2016-2017 $53,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Dame Patti Drive Near Ben Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302179 Ground Surface Indicators, Kerb, 2016-2017 $55,000
Lexcen Drive • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
Retaining wall, Indent bay, Concrete • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Castaways Beach
(Southbound)
slab, Type C4 Shelter, Tactile Ground Infrastructure Program (PTAIP) 2017-2018
2017-2018 • Translink Funding
301580
David Low Way / Wavecrest
Surface Indicators, Kerb, Relocation • Bus Stop Prioritisation Spreadsheet (2014- $130,000 Agreement (2017-18)
of service, Realign Guardrail and 2015)
Drive
Pathway connections
Castaways Beach • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Type C1-H Shelter, Slab, Tactile
(Northbound) Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301579 Ground Surface Indicators, Kerb, $50,000
David Low Way / Wavecrest • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Pathway connection
Drive 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Marcus Beach (Southbound)
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301656 David Low Way / Melalucca $60,000
Surface Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Street
connections 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Marcus Beach (Northbound)
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301655 David Low Way / Mahogany $70,000
Surface Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Drive
connections 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 • Translink Funding
Surface Indicators, slab, Turf • Bus Stop Prioritisation Spreadsheet (2014- 2017-2018 Agreement (2017-18)
302180 Orient Drive Newfield Street embankment and pathway 2015) $65,000
connections
Provision to adjust sewer manholes
($3000)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Noosa Convention Centre Type C1-H shelter, Kerb, Tactile
Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301813 (Westbound) Ground Surface Indicators, slab and $50,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Hilton Terrace / Ernest Street pathway connections
2015)
13
Section 14
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Ernest Street / Goodchap Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
302196 Close $0
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
2015)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Ernest Street / Goodchap Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
302197 Close $0
Street • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
2015)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Cooroy Noosa Road / Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301815 Type C1-H Shelter on existing slab $25,000
Beckmans Rd • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
2015)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Cooroy Noosa Road / Griffith Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301809 Type C1-H Shelter on existing slab $25,000
Avenue • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Cooroy Noosa Road / Griffith widening, Tactile Ground Surface Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301816 $50,000
Avenue Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
connections 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Cooroy Noosa Road / widening, Tactile Ground Surface Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
302232 $50,000
Tinbeerwah Road Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
connections 2015)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Tactile Ground
Program (MOWP) Schedule (2017)
302118 Goodchap St / Juron Street Surface Indicators, slab and pathway 2018-2019 $55,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections
2015) Agreement MOWP(2017-18)
Type C1-H shelter, pavement • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
widening, Kerb, Tactile Ground Program (MOWP) Schedule (2017)
302119 Goodchap St/ Heritage Drive 2018-2019 $60,000
Surface Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections 2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Program (MOWP) Schedule (2017)
301762 Hilton Tce / Hilton Esplanade Ground Surface Indicators, slab and 2018-2019 $8,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Eumundi-Noosa Road / Rene Program (MOWP) Schedule (2017)
301745 Ground Surface Indicators, slab and 2018-2019 $50,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
14
Section 15
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
Lower existing 3.5m wide path by 1m. • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Lower existing OPTIC FIBRE X2 Program (MOWP) Schedule (2017)
301746
Eumundi-Noosa Road / Rene Lower existing High Voltage unground • Bus Stop Prioritisation Spreadsheet (2014- 2018-2019 $170,000 • Translink Funding
Street Power x 2 2015) Agreement MOWP(2017-18)
Lower existing Water Main
New boarding platform and seat
Relocate north of pedestrian crossing, • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Sea eagle Drive / Beckmans new kerb, boarding platform, Tactile Program (MOWP) Schedule (2017)
317921 2018-2019 $15,000
Rd Ground Surface Indicators and • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections 2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302193 Pacific Avenue / Weyba Street Pathway, Kerb and Tactile Ground 2018-2019 $17,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Factory Street / Reserve Program (MOWP) Schedule (2017)
302167 Pathway, Kerb and Tactile Ground 2018-2019 $15,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Leslie Drive / Noosa Springs Program (MOWP) Schedule (2017)
302110 Pathway, Kerb and Tactile Ground 2018-2019 $20,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Leslie Drive / Noosa Springs Program (MOWP) Schedule (2017)
302113 Pathway, Kerb and Tactile Ground 2018-2019 $20,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Program (MOWP) Schedule (2017)
302112 Leslie Drive / Paul Street Ground Surface Indicators, slab and 2018-2019 $50,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Leslie Drive / Weyba Park Program (MOWP) Schedule (2017)
302111 Ground Surface Indicators, slab and 2018-2019 $50,000
Crescent • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302181 Orient Drive / Corsair Crescent Pathway, Kerb and Tactile Ground 2018-2019 $20,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302195 Solway Drive / Surf Street Pathway, Kerb and Tactile Ground 2018-2019 $14,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
15
Section 16
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
Concrete Boarding point, Seat, • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Pathway, Kerb and Tactile Ground Program (MOWP) Schedule (2017)
Goodchap Street / Ridge
302203
Street
Surface Indicators Concrete Boarding • Bus Stop Prioritisation Spreadsheet (2014- 2019-2020 $30,000 • Translink Funding
point, Seat, Pathway, Kerb and 2015) Agreement MOWP(2017-18)
Tactile Ground Surface Indicators
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Goodchap Street / Ridge Program (MOWP) Schedule (2017)
302204 Pathway, Kerb and Tactile Ground 2019-2020 $22,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Outlook Drive / Buchanan Program (MOWP) Schedule (2017)
302222 Pathway, Kerb and Tactile Ground 2019-2020 $13,000
Crescent • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302220 Outlook Drive / Freeman Court Pathway, Kerb and Tactile Ground 2019-2020 $18,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Overlander Avenue / Maple Program (MOWP) Schedule (2017)
301961 Pathway, Kerb and Tactile Ground 2019-2020 $18,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type R1 shelter, pavement widening,
Pomona Kin Kin Road / Program (MOWP) Schedule (2017)
302166 Tactile Ground Surface Indicators and 2019-2020 $50,000
Mountain View Road • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
slab
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Moorindil Street / Gympie Program (MOWP) Schedule (2017)
302216 Ground Surface Indicators, slab and 2019-2020 $52,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302219 Outlook Drive / Donavon Court Pathway, Kerb and Tactile Ground 2019-2020 $13,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302226 Outlook Drive / Donavon Court Pathway, Kerb and Tactile Ground 2019-2020 $15,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
Type C1-H shelter, Pavement • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Noosa Leisure Centre - widening, Kerb, Tactile Ground Program (MOWP) Schedule (2017)
302130 2019-2020 $60,000
Wallace Drive Surface Indicators, Slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections 2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Leisure Centre - Program (MOWP) Schedule (2017)
302129 Pathway, Kerb and Tactile Ground 2019-2020 $20,000
Wallace Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
16
Section 17
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type R1 shelter, Kerb, Tactile Ground
Program (MOWP) Schedule (2017)
301953 Emerald Street / Wattle Street Surface Indicators, slab and pathway 2019-2020 $30,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Parade / Ravenwood Program (MOWP) Schedule (2017)
301735 Pathway, Kerb and Tactile Ground 2019-2020 $16,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Parade / Ravenwood Program (MOWP) Schedule (2017)
301736 Pathway, Kerb and Tactile Ground 2019-2020 $15,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
Total = $4,485,000
List of Bus Stop Project Attachments:
1. DDA Prioritisation- Jan 2015.XLSX
2. PTAIP 2014-15 Projects List.XLSX
3. PTAIP 2015-16 Projects List.XLSX
4. PTAIP 2016-17 Projects List.XLSX
5. PTAIP 2017-18 Projects List.XLSX
6. Proposed bus stop upgrades schedule.PDF
7. PTAIP 2014-15 Funding Agreement.XLSX
8. PTAIP 2015-16 Funding Agreement.XLSX
9. PTAIP 2016-17 Funding Agreement.XLSX
10. PTAIP 2017-18 Funding Agreement.XLSX
11. PTAIP 2017-18- MOWP.DOCX (Passenger Transport Accessible Infrastructure Program)
12. Capital_works_project_initiation shelter H302125
17
Section 18
ATTACHMENT 2
Gympie Regional
Council Area
Boreen Point, Kin Kin & Cootharaba
Kin Kin
Noosa North Shore
Boreen
Point
Cooran
Cooroibah
Pomona
Mary River Catchment
Noosa
Heads
Tewantin
Tewantin & Doonan Noosa Heads
Cooroy & Lake Macdonald
Cooroy
Noosaville
Eastern Beaches
Sunshine Coast
Regional Council
Area
Peregian
Great
Great
Great
Great
Great
Noosa Plan
Sandy
Sandy
Sandy
Sandy
Sandy
PFTI Transport Key Map
Trunk Roads
Region
Region
Region
Region
Region
Council
Area
Area
Area
Area
Area Covered
Covered
Area Covered
Covered
Covered
Covered Main Roads
by the
by the
by the
Noosa
Noosa Plan
Noosa
Noosa
Noosa
Noosa Plan
Plan
Plan
Plan
Plan
StreamsRivers
Sunshine
Sunshine
Sunshine
0 2 4
Sunshine
Sunshine
Coast
Coast
Coast
Coast
Coast
Coast Kilometres PIA Boundaries
South
South Scale 1cm : 1.3km
South
South
South
Noosa Shire Boundaries
The map is a reproduction from Council’s
East
East
East
East
East GIS, with a scale of accuracy of 1:25 000.
Brisbane
Brisbane
Brisbane
Brisbane Data on which it is based was gathered
at mostly finer scales. Precise boundaries
Waterbodies
may need to be defined by site survey.
Queensland
Queensland
Queensland
Queensland
Queensland Council Copyright Reserved.
Locality Boundaries
Workspace Location: StrategyMap.wor
(Sub-catchments)
Section 19
Kin Kin Village Inset Boreen Point Village Inset
PERS
EVE
RAN
CE RD
RD AT
WOONG URUNGA
AR ST PAR
LAKE FL
RAINFOREST CT
AY
NW
TOOLAR
A ST
TO
AV
ER
OV
D
MA
IN
ORCHAR
VISTA ST
CREE ST URANGA
K RD N ST
ST
ER LAGUNA
LM ST
ST
PA
AN
TEWAH
RD
WM
BO
DTMR-6
KIN RD
E
AD
KIN
AN
POMONA
PL
ES
Inset Map Scale is 1cm : 200m
0 250 500
metres
R16
DTMR-8
DTMR-7
SISTE
DR PA
GES R
R TRE
D
ROAD
E CRE
KIN KIN
R1
EK RD
IE
GYMP
Kin Kin
R2
Village Inset
LAKE FL˜
˜
˜
˜
˜
AT RD
D
BA R
RA
THA
D
KIN KIN R
COO
DTMR-5
Boreen Point
Village Inset
POMONA
R
D
O
ZZ
BA
IS
U
D
LO
B AR
ARA
O TH
CO
O DR
BAZZ
LOUIS
LOUIS BA
ZZ
O
DR
0 2 4
˜
˜
˜
˜
˜ ˜
˜
˜
˜
˜
˜
˜
˜˜
˜
Kilometres
E
MCKINNON DRIV
DR Main Map Scale is 1cm : 800m
LOUIS BAZZO
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah
3 Cooroy & Lake Macdonald
Boreen Point, Kin Kin & Cootharaba
4 Eastern Beaches Existing Trunk Infrastructure
5 Mary River Catchment
6 Noosa Heads
PFTI Transport Locality Boundaries Trunk Bridges
7 Noosa North Shore
8 Noosaville
9 Tewantin & Doonan Map 1 (Sub-catchments)
Railway Line
Footbridge
Roadbridge
1 Property Underpass
Noosa Shire
Boundaries
7 Major Water Boundary
Trunk Bus Stops
Bodies Streams
2 PIA and Rivers
Trunk Roads
5 Inset
Boundaries Council
6 Main Roads
9
3 8 This map, is a reproduction from Council’s
GIS, has a scale of accuracy of 1:25 000, al- Trunk Paths
though data on which it is based was gathered
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey.
Council Copyright Reserved.
Workspace Location: N:\07 Planning\Projects_Done_by_Ali_for_LUD\Transport
Section 20
O
ZZ
BA
IS
U
LO
A RD
RAB
HA
Cootharaba
Noosa Nor
Shore
O DR
BAZZ
LOUIS
DRIVE
MCKINNON
Cooroibah
Village Inset
LAKE
COOROIBAH
Cooroibah
Ringtail PW1
LAK
E
Creek
CO
OR
OIBA
H
RD
˜
˜
˜
˜
˜
˜
N DR
INNO
MCK
˜
˜
˜
˜
˜
MC
KIN
˜
˜
˜
˜
˜
˜
NO
Cooroibah Village Inset
N
˜˜
DR
˜˜
˜
DAL ST
˜
˜
˜
˜
˜
˜
˜
˜
T e w a n˜˜˜˜˜˜˜t i n
MOORIN
LAKE CO
˜
˜
˜
˜
˜
OROIBAH
RD
DR
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜ ˜
˜
˜
˜
˜˜
D
˜ ˜
˜
˜
˜
˜ ˜
AL
LAKE ˜
˜
˜
˜
˜
ST
˜
˜
˜
ON
BUTLER
AV
MACDONALD LAKEWA
Y DR
FI
TH
CD
IF
GR ˜
˜
MO
˜
˜˜
˜
˜
˜ ˜
˜ ˜
˜
˜ LAKE
RN
MA
ES
DOONELL
IN
˜
˜
PL
˜˜ ˜
˜
˜
PIN
˜
˜˜
G
˜
˜
˜
˜
˜
˜
SU
AN
˜
˜
GL
˜
˜
˜
ES
D
KE
NS
AR
AD
˜
˜
OR
˜
˜
˜˜˜ ˜
˜
˜
AV
OS ˜ ˜
˜
˜˜˜
ET
˜
˜ ˜
˜ ˜
E
˜
˜
˜
˜ ˜
˜
Y
NO ˜
˜
˜
WY
DR
Y
LA
RO
PW1 OO
RD
˜
˜
˜
˜
˜ C ˜
˜
˜
BECKMA
˜
˜
AH
T ˜
˜
˜
OIB
˜
˜
˜
LE
YS
Main Map Scale is 1cm : 400m ˜
˜
˜
˜
˜
˜
OR
R
Inset Scale 1cm : 150m AN
SD
ST
CO
8a
NS RD
0 1 2 ˜˜
˜
˜
˜
˜
˜ ˜
˜
˜
˜ ˜
˜
EW
˜
˜
˜
KE
0 250 500
LA
DR
˜
˜
˜
˜
˜
˜
AN
metres ˜
˜
˜
˜
ST
˜
˜
˜
Kilometres ˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
˜
D Cooroibah
AR
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah
S
OO
3 Cooroy & Lake Macdonald
4 Eastern Beaches
N PFTI Transport Existing Trunk Infrastructure
5 Mary River Catchment
OY Locality Boundaries
6 Noosa Heads
OR Map 2 Trunk Bridges
7 Noosa North Shore
8 Noosaville
CO (Sub-catchments) Footbridge
9 Tewantin & Doonan
Property Railway Line Roadbridge
1 Noosa Shire Underpass
Boundaries
Major Water Boundary
7
Bodies Streams Trunk Bus Stops
PIA and Rivers
2 Trunk Roads
5
Boundaries Inset Council
6 Main Roads
9
3 8 This map, is a reproduction from Council’s
GIS, has a scale of accuracy of 1:25 000, al- Trunk Paths
though data on which it is based was gathered
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey.
Council Copyright Reserved.
Workspace Location: N:\07 Planning\Projects_Done_by_Ali_for_LUD\Transport
The text continues on section 21.