Original source · versioned page text
2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
Very large file: it may take a few minutes
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Modify existing shelter, pathway, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302214 Moorindil St near Read St 2015-2016 $18,000
boarding platform, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R1 shelter, Concrete slab, kerb, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301598 Cooroy Railway Station 2015-2016 $60,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301733 Hibiscus Avenue (West) Tactile Ground Surface Indicators, 2015-2016 $61,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, line marking
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301734 Hibiscus Avenue (East) Tactile Ground Surface Indicators, 2015-2016 $58,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, retaining wall,
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4-P shelter, concrete slab, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301754 Massoud Park 2015-2016 $54,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4-P shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301758 James Duke Bridge kerb, Adjust SW pit lid, Tactile Ground 2015-2016 $56,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators and pathway
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301781 DLW at Peregian Beach Tactile Ground Surface Indicators, 2015-2016 $56,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, tree removal
2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
pathway, kerb, Tactile Ground Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301787 Peregian Beach Water Tower 2015-2016 $59,000
Surface Indicators, Pavement • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
rehabilitation, bin 2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301811 Tewantin Noosa Golf Club 2015-2016 $56,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C1-H shelter, concrete slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301812 Tewantin Noosa Golf Club pathway, kerb, Tactile Ground 2015-2016 $56,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Surface Indicators, bin
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R2 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301959 Maple St near Myall St Tactile Ground Surface Indicators, 2015-2016 $60,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, pathway
2015)
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.