2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
Very large file: it may take a few minutes
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
Type C1-H shelter, concrete slab, bin, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
concrete boarding platform, Tactile Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302108 Cooyar St near Ilangura St 2015-2016 $52,000
Ground Surface Indicators, and repair • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
pathway 2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301759 Lions Park 2015-2016 $56,500
kerb, pathway and rehabilitate bus • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bay. 2015)
Type C1-H shelter, concrete slab, • Passenger Transport Accessible • PTAIP 2015-16 Projects List
kerb, Tactile Ground Surface Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301782 Peregian North 2015-2016 $56,000
Indicators, bin, rock retaining wall and • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Pathway 2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, concrete slab, kerb,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301822 Ward Park Tactile Ground Surface Indicators, 2015-2016 $63,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
bin, retaining wall, pathway
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type C4 shelter, Concrete Slab,
Infrastructure Program (PTAIP) 2015-16 • Translink Funding
302123 Mary st near Edward St Pathway, Bin, Kerb and Tactile 2015-2016 $23,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
Ground Surface Indicators
2015)
• Passenger Transport Accessible • PTAIP 2015-16 Projects List
Type R1 shelter, concrete slab, kerb, Infrastructure Program (PTAIP) 2015-16 • Translink Funding
301954 Ferrells Road near Myall St 2015-2016 $56,500
Tactile Ground Surface Indicators, bin • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2015-2016)
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301749 Robert Street Ground Surface Indicators, Pathway 2016-2017 $8,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
Raised concrete boarding platform, • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301750 The Cockleshell 2016-2017 $20,000
Pathway connection, Landscaping • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
and Seat 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301790 Woodland Drive Ground Surface Indicators, Pathway 2016-2017 $15,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Moorindil Street near George Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302215 2016-2017 $55,000
Street Pathway connection, Kerb ramp and • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
refuge. 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Tactile Ground Surface Indicators, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
319560 King Street near Prince Street 2016-2017 $20,000
Seat, Retaining wall. • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
2015)
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.