Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Concrete boarding platform, Tactile
Lake Weyba Drive near Creek Infrastructure Program (PTAIP) 2016-2017 $13,000 • Translink Funding
302121 Ground Surface Indicators, Pathway 2016-2017
Road • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection and Seat
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302191 Pacific Ave Near Wildflower Ground Surface Indicators, Kerb, 2016-2017 $53,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302192 Pacific Ave Near Ferguson Ground Surface Indicators, Kerb, 2016-2017 $53,500
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Dame Patti Drive Near Ben Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302179 Ground Surface Indicators, Kerb, 2016-2017 $55,000
Lexcen Drive • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
Retaining wall, Indent bay, Concrete • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Castaways Beach
(Southbound)
slab, Type C4 Shelter, Tactile Ground Infrastructure Program (PTAIP) 2017-2018
2017-2018 • Translink Funding
301580
David Low Way / Wavecrest
Surface Indicators, Kerb, Relocation • Bus Stop Prioritisation Spreadsheet (2014- $130,000 Agreement (2017-18)
of service, Realign Guardrail and 2015)
Drive
Pathway connections
Castaways Beach • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Type C1-H Shelter, Slab, Tactile
(Northbound) Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301579 Ground Surface Indicators, Kerb, $50,000
David Low Way / Wavecrest • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Pathway connection
Drive 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Marcus Beach (Southbound)
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301656 David Low Way / Melalucca $60,000
Surface Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Street
connections 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
Marcus Beach (Northbound)
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301655 David Low Way / Mahogany $70,000
Surface Indicators, slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Drive
connections 2015)
Type C1-H shelter, pavement • Passenger Transport Accessible • PTAIP 2017-18 Projects List
widening, Kerb, Tactile Ground Infrastructure Program (PTAIP) 2017-2018 • Translink Funding
Surface Indicators, slab, Turf • Bus Stop Prioritisation Spreadsheet (2014- 2017-2018 Agreement (2017-18)
302180 Orient Drive Newfield Street embankment and pathway 2015) $65,000
connections
Provision to adjust sewer manholes
($3000)
• Passenger Transport Accessible • PTAIP 2017-18 Projects List
Noosa Convention Centre Type C1-H shelter, Kerb, Tactile
Infrastructure Program (PTAIP) 2017-2018 2017-2018 • Translink Funding
301813 (Westbound) Ground Surface Indicators, slab and $50,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2017-18)
Hilton Terrace / Ernest Street pathway connections
2015)
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.