2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
Very large file: it may take a few minutes
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type R1 Shelter, Slab, Tactile Ground
Tewantin Road near Olivine Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301962 Surface Indicators, Pathway 2016-2017 $52,000
Street (Eastbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection, retaining wall
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type R1 Shelter, Slab, Tactile Ground
Tewantin Road near Miva Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301963 Surface Indicators, Kerb, Pathway 2016-2017 $52,000
Street (Westbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection
2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Castaways Creek Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301581 2016-2017 $70,000
(Northbound) Pathway connection, Retaining wall • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
and Concrete indent bay 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Sunrise Beach Ground Surface Indicators, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301799 2016-2017 $80,000
(Northbound) connection, Kerb, and Concrete • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
indent bay 2015)
Type C2 Shelter, Slab, Tactile Ground • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Surface Indicators, Kerb, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301503 Tewantin Central (Westbound) 2016-2017 $70,000
connection, Pavement renewal, • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Embankment work 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301801 Vernon Street (Northbound) 2016-2017 $65,000
Pathway connection, Pavement • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
narrowing and recut table drain. 2015)
Type C1-H Shelter, Slab, Tactile • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Ground Surface Indicators, Kerb, Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301802 Vernon Street (Southbound) Pathway connection, Indent bay, • Bus Stop Prioritisation Spreadsheet (2014- 2016-2017 $75,000 Agreement (2016-2017)
embankment works and Concrete 2015)
indent bay
Type C4 Shelter, Slab, Tactile Ground • Passenger Transport Accessible • PTAIP 2016-17 Projects List
Cooyar Street near Elanora Surface Indicators, Kerb, Pathway Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
302109 2016-2017 $90,000
Terrace connection, Adjustment of services, • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
revegetation of existing site. 2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Bougainvillia Caravan Park Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301807 Ground Surface Indicators, Kerb, 2016-2017 $48,000
(Eastbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Bougainvillia Caravan Park Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301814 Ground Surface Indicators, Kerb, 2016-2017 $48,000
(Westbound) • Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
Pathway connection
2015)
• Passenger Transport Accessible • PTAIP 2016-17 Projects List
Type C1-H Shelter, Slab, Tactile
Infrastructure Program (PTAIP) 2016-2017 • Translink Funding
301748 Gibson road Ground Surface Indicators, Pathway 2016-2017 $48,000
• Bus Stop Prioritisation Spreadsheet (2014- Agreement (2016-2017)
connection
2015)
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file