2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Project
  ID                                                                                                                            Proposed    Base Cost
             Location Description                Project Description             Planning Basis                                                         Cost Basis (Budget)
(Hastus                                                                                                                          Timing      Estimate
Number)
                                                                                 • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                         Type R1 Shelter, Slab, Tactile Ground
           Tewantin Road near Olivine                                              Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301962                                       Surface Indicators, Pathway                                                        2016-2017    $52,000
              Street (Eastbound)                                                 • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                              connection, retaining wall
                                                                                   2015)
                                                                                 • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                         Type R1 Shelter, Slab, Tactile Ground
            Tewantin Road near Miva                                                Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301963                                     Surface Indicators, Kerb, Pathway                                                    2016-2017    $52,000
              Street (Westbound)                                                 • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                      connection
                                                                                   2015)
                                            Type C1-H Shelter, Slab, Tactile     • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
               Castaways Creek             Ground Surface Indicators, Kerb,        Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301581                                                                                                                          2016-2017    $70,000
                (Northbound)              Pathway connection, Retaining wall     • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                and Concrete indent bay            2015)
                                            Type C1-H Shelter, Slab, Tactile     • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                 Sunrise Beach            Ground Surface Indicators, Pathway       Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301799                                                                                                                          2016-2017    $80,000
                 (Northbound)               connection, Kerb, and Concrete       • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                       indent bay                  2015)
                                         Type C2 Shelter, Slab, Tactile Ground   • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                           Surface Indicators, Kerb, Pathway       Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301503    Tewantin Central (Westbound)                                                                                          2016-2017    $70,000
                                            connection, Pavement renewal,        • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                  Embankment work                  2015)
                                            Type C1-H Shelter, Slab, Tactile     • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                           Ground Surface Indicators, Kerb,        Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301801     Vernon Street (Northbound)                                                                                           2016-2017    $65,000
                                            Pathway connection, Pavement         • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                            narrowing and recut table drain.       2015)
                                            Type C1-H Shelter, Slab, Tactile     • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                           Ground Surface Indicators, Kerb,        Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301802     Vernon Street (Southbound)      Pathway connection, Indent bay,       • Bus Stop Prioritisation Spreadsheet (2014-   2016-2017    $75,000      Agreement (2016-2017)
                                           embankment works and Concrete           2015)
                                                       indent bay
                                         Type C4 Shelter, Slab, Tactile Ground   • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
           Cooyar Street near Elanora      Surface Indicators, Kerb, Pathway       Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
302109                                                                                                                          2016-2017    $90,000
                    Terrace               connection, Adjustment of services,    • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                              revegetation of existing site.       2015)
                                                                                 • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                           Type C1-H Shelter, Slab, Tactile
           Bougainvillia Caravan Park                                              Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301807                                     Ground Surface Indicators, Kerb,                                                     2016-2017    $48,000
                 (Eastbound)                                                     • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                Pathway connection
                                                                                   2015)
                                                                                 • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                           Type C1-H Shelter, Slab, Tactile
           Bougainvillia Caravan Park                                              Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301814                                     Ground Surface Indicators, Kerb,                                                     2016-2017    $48,000
                 (Westbound)                                                     • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                Pathway connection
                                                                                   2015)
                                                                                 • Passenger Transport Accessible                                       • PTAIP 2016-17 Projects List
                                          Type C1-H Shelter, Slab, Tactile
                                                                                   Infrastructure Program (PTAIP) 2016-2017                             • Translink Funding
301748            Gibson road            Ground Surface Indicators, Pathway                                                     2016-2017    $48,000
                                                                                 • Bus Stop Prioritisation Spreadsheet (2014-                             Agreement (2016-2017)
                                                    connection
                                                                                   2015)

                                                                                                                                                                                  12
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps(PDF, 23MB).pdf · 23.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.