2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Project
  ID                                                                                                                                Proposed    Base Cost
              Location Description                  Project Description              Planning Basis                                                         Cost Basis (Budget)
(Hastus                                                                                                                              Timing      Estimate
Number)
                                            Lower existing 3.5m wide path by 1m.     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Lower existing OPTIC FIBRE X2            Program (MOWP)                                                         Schedule (2017)
301746
          Eumundi-Noosa Road / Rene         Lower existing High Voltage unground     • Bus Stop Prioritisation Spreadsheet (2014-   2018-2019   $170,000    • Translink Funding
                   Street                                 Power x 2                    2015)                                                                  Agreement MOWP(2017-18)
                                                 Lower existing Water Main
                                               New boarding platform and seat
                                            Relocate north of pedestrian crossing,   • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
           Sea eagle Drive / Beckmans        new kerb, boarding platform, Tactile      Program (MOWP)                                                         Schedule (2017)
317921                                                                                                                              2018-2019    $15,000
                      Rd                       Ground Surface Indicators and         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    pathway connections                2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
                                                                                       Program (MOWP)                                                         Schedule (2017)
302193    Pacific Avenue / Weyba Street      Pathway, Kerb and Tactile Ground                                                       2018-2019    $17,000
                                                                                     • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
             Factory Street / Reserve                                                  Program (MOWP)                                                         Schedule (2017)
302167                                       Pathway, Kerb and Tactile Ground                                                       2018-2019    $15,000
                      Street                                                         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
           Leslie Drive / Noosa Springs                                                Program (MOWP)                                                         Schedule (2017)
302110                                       Pathway, Kerb and Tactile Ground                                                       2018-2019    $20,000
                       Drive                                                         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
           Leslie Drive / Noosa Springs                                                Program (MOWP)                                                         Schedule (2017)
302113                                       Pathway, Kerb and Tactile Ground                                                       2018-2019    $20,000
                       Drive                                                         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                             Type C1-H shelter, Kerb, Tactile
                                                                                       Program (MOWP)                                                         Schedule (2017)
302112       Leslie Drive / Paul Street     Ground Surface Indicators, slab and                                                     2018-2019    $50,000
                                                                                     • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  pathway connections
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                             Type C1-H shelter, Kerb, Tactile
            Leslie Drive / Weyba Park                                                  Program (MOWP)                                                         Schedule (2017)
302111                                      Ground Surface Indicators, slab and                                                     2018-2019    $50,000
                    Crescent                                                         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  pathway connections
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
                                                                                       Program (MOWP)                                                         Schedule (2017)
302181    Orient Drive / Corsair Crescent    Pathway, Kerb and Tactile Ground                                                       2018-2019    $20,000
                                                                                     • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)
                                                                                     • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                              Concrete Boarding point, Seat,
                                                                                       Program (MOWP)                                                         Schedule (2017)
302195      Solway Drive / Surf Street       Pathway, Kerb and Tactile Ground                                                       2018-2019    $14,000
                                                                                     • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                    Surface Indicators
                                                                                       2015)                                                                  Agreement MOWP(2017-18)




                                                                                                                                                                                    15
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps(PDF, 23MB).pdf · 23.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.