Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
Concrete Boarding point, Seat, • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Pathway, Kerb and Tactile Ground Program (MOWP) Schedule (2017)
Goodchap Street / Ridge
302203
Street
Surface Indicators Concrete Boarding • Bus Stop Prioritisation Spreadsheet (2014- 2019-2020 $30,000 • Translink Funding
point, Seat, Pathway, Kerb and 2015) Agreement MOWP(2017-18)
Tactile Ground Surface Indicators
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Goodchap Street / Ridge Program (MOWP) Schedule (2017)
302204 Pathway, Kerb and Tactile Ground 2019-2020 $22,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Outlook Drive / Buchanan Program (MOWP) Schedule (2017)
302222 Pathway, Kerb and Tactile Ground 2019-2020 $13,000
Crescent • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302220 Outlook Drive / Freeman Court Pathway, Kerb and Tactile Ground 2019-2020 $18,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Overlander Avenue / Maple Program (MOWP) Schedule (2017)
301961 Pathway, Kerb and Tactile Ground 2019-2020 $18,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type R1 shelter, pavement widening,
Pomona Kin Kin Road / Program (MOWP) Schedule (2017)
302166 Tactile Ground Surface Indicators and 2019-2020 $50,000
Mountain View Road • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
slab
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type C1-H shelter, Kerb, Tactile
Moorindil Street / Gympie Program (MOWP) Schedule (2017)
302216 Ground Surface Indicators, slab and 2019-2020 $52,000
Street • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
pathway connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302219 Outlook Drive / Donavon Court Pathway, Kerb and Tactile Ground 2019-2020 $13,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Program (MOWP) Schedule (2017)
302226 Outlook Drive / Donavon Court Pathway, Kerb and Tactile Ground 2019-2020 $15,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
Type C1-H shelter, Pavement • PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Noosa Leisure Centre - widening, Kerb, Tactile Ground Program (MOWP) Schedule (2017)
302130 2019-2020 $60,000
Wallace Drive Surface Indicators, Slab and pathway • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections 2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Leisure Centre - Program (MOWP) Schedule (2017)
302129 Pathway, Kerb and Tactile Ground 2019-2020 $20,000
Wallace Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.