Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Project
  ID                                                                                                                             Proposed    Base Cost
             Location Description                 Project Description             Planning Basis                                                         Cost Basis (Budget)
(Hastus                                                                                                                           Timing      Estimate
Number)
                                             Concrete Boarding point, Seat,       • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                           Pathway, Kerb and Tactile Ground         Program (MOWP)                                                         Schedule (2017)
            Goodchap Street / Ridge
302203
                   Street
                                          Surface Indicators Concrete Boarding    • Bus Stop Prioritisation Spreadsheet (2014-   2019-2020    $30,000    • Translink Funding
                                             point, Seat, Pathway, Kerb and         2015)                                                                  Agreement MOWP(2017-18)
                                           Tactile Ground Surface Indicators
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
            Goodchap Street / Ridge                                                 Program (MOWP)                                                         Schedule (2017)
302204                                     Pathway, Kerb and Tactile Ground                                                      2019-2020    $22,000
                   Street                                                         • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
            Outlook Drive / Buchanan                                                Program (MOWP)                                                         Schedule (2017)
302222                                     Pathway, Kerb and Tactile Ground                                                      2019-2020    $13,000
                    Crescent                                                      • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
                                                                                    Program (MOWP)                                                         Schedule (2017)
302220    Outlook Drive / Freeman Court    Pathway, Kerb and Tactile Ground                                                      2019-2020    $18,000
                                                                                  • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
           Overlander Avenue / Maple                                                Program (MOWP)                                                         Schedule (2017)
301961                                     Pathway, Kerb and Tactile Ground                                                      2019-2020    $18,000
                    Street                                                        • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                          Type R1 shelter, pavement widening,
             Pomona Kin Kin Road /                                                  Program (MOWP)                                                         Schedule (2017)
302166                                    Tactile Ground Surface Indicators and                                                  2019-2020    $50,000
              Mountain View Road                                                  • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                          slab
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                           Type C1-H shelter, Kerb, Tactile
            Moorindil Street / Gympie                                               Program (MOWP)                                                         Schedule (2017)
302216                                    Ground Surface Indicators, slab and                                                    2019-2020    $52,000
                      Street                                                      • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                pathway connections
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
                                                                                    Program (MOWP)                                                         Schedule (2017)
302219    Outlook Drive / Donavon Court    Pathway, Kerb and Tactile Ground                                                      2019-2020    $13,000
                                                                                  • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
                                                                                    Program (MOWP)                                                         Schedule (2017)
302226    Outlook Drive / Donavon Court    Pathway, Kerb and Tactile Ground                                                      2019-2020    $15,000
                                                                                  • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)
                                             Type C1-H shelter, Pavement          • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
             Noosa Leisure Centre -          widening, Kerb, Tactile Ground         Program (MOWP)                                                         Schedule (2017)
302130                                                                                                                           2019-2020    $60,000
                Wallace Drive             Surface Indicators, Slab and pathway    • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                       connections                  2015)                                                                  Agreement MOWP(2017-18)
                                                                                  • PTAIP 2017-2018 Method of Works                                      • Proposed Bus Stop Upgrade
                                            Concrete Boarding point, Seat,
             Noosa Leisure Centre -                                                 Program (MOWP)                                                         Schedule (2017)
302129                                     Pathway, Kerb and Tactile Ground                                                      2019-2020    $20,000
                Wallace Drive                                                     • Bus Stop Prioritisation Spreadsheet (2014-                           • Translink Funding
                                                  Surface Indicators
                                                                                    2015)                                                                  Agreement MOWP(2017-18)

                                                                                                                                                                                 16
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps(PDF, 23MB).pdf · 23.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.