2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
Very large file: it may take a few minutes
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Project
ID Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis (Budget)
(Hastus Timing Estimate
Number)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Type R1 shelter, Kerb, Tactile Ground
Program (MOWP) Schedule (2017)
301953 Emerald Street / Wattle Street Surface Indicators, slab and pathway 2019-2020 $30,000
• Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
connections
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Parade / Ravenwood Program (MOWP) Schedule (2017)
301735 Pathway, Kerb and Tactile Ground 2019-2020 $16,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
• PTAIP 2017-2018 Method of Works • Proposed Bus Stop Upgrade
Concrete Boarding point, Seat,
Noosa Parade / Ravenwood Program (MOWP) Schedule (2017)
301736 Pathway, Kerb and Tactile Ground 2019-2020 $15,000
Drive • Bus Stop Prioritisation Spreadsheet (2014- • Translink Funding
Surface Indicators
2015) Agreement MOWP(2017-18)
Total = $4,485,000
List of Bus Stop Project Attachments:
1. DDA Prioritisation- Jan 2015.XLSX
2. PTAIP 2014-15 Projects List.XLSX
3. PTAIP 2015-16 Projects List.XLSX
4. PTAIP 2016-17 Projects List.XLSX
5. PTAIP 2017-18 Projects List.XLSX
6. Proposed bus stop upgrades schedule.PDF
7. PTAIP 2014-15 Funding Agreement.XLSX
8. PTAIP 2015-16 Funding Agreement.XLSX
9. PTAIP 2016-17 Funding Agreement.XLSX
10. PTAIP 2017-18 Funding Agreement.XLSX
11. PTAIP 2017-18- MOWP.DOCX (Passenger Transport Accessible Infrastructure Program)
12. Capital_works_project_initiation shelter H302125
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.