2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

  2. Pathway Future Projects
Project                                                                                                                    Proposed    Base Cost
          Location Description           Project Description                    Planning Basis                                                       Cost Basis
  ID                                                                                                                       Timing      Estimate
                                                                                 • PIP (September 2013)
          Lake Cooroibah Road,           Connection from Mckinnon Drive to                                                                           Cost estimate Att No.1
PW-1                                                                             • Provide Trunk path linkage connection   2021-2026      $683,964
          Cooroibah                      Lake Cooroibah                                                                                              Length 2,700m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Connection of missing Link to Town                                                                          Cost estimate Att No.1
PW-2      Garnett Street, Cooroy                                                 • Provide Trunk path linkage connection   2015-2016      $168,880
                                         Centre.                                                                                                     Length 1,000m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Swift Drive connection to Town                                                                              Cost estimate Att No.1
PW-3      Swift Drive, Cooroy
                                         Centre
                                                                                 • Provide Trunk path linkage connection   2026-2031      $371,536
                                                                                                                                                     Length 2,200m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Lake Macdonald Drive, connection to                                                                         Cost estimate Att No.1
PW-4      Lake Macdonald Drive, Cooroy
                                         Botanic Gardens to Town Centre
                                                                                 • Provide Trunk path linkage connection   2026-2031      $227,988
                                                                                                                                                     Length 900m
                                                                                   per Transport DSS
                                         Pathway upgrade and pedestrian          • Provide Trunk path linkage connection                             Cost estimate Att No.1
PW-5      Hill Street, Sunshine Beach
                                         safety improvements.                      per Transport DSS
                                                                                                                           2016-2021       $82,329
                                                                                                                                                     Length 325m
          Heathland Drive, David Low     Missing Link and Connections.           • PIP (September 2013)
                                                                                                                                                     Cost estimate Att No.1
PW-6      Way, Edward street, Sunshine   Pathway upgrade and pedestrian          • Provide Trunk path linkage connection   2016-2021      $595,302
                                                                                                                                                     Length 2,350m
          Beach                          safety improvements.                      per Transport DSS
                                         David Low Way, Peregian Beach
          David Low Way, Peregian        pedestrian safety improvements and      • Provide Trunk path linkage connection                             Att 2 David Low Way Ped
PW-7      Beach                          rufous street, Community centre           per Transport DSS
                                                                                                                           2017-2018      $100,000
                                                                                                                                                     refuge.
                                         connection to Village.
                                                                                 • PIP (September 2013)
          David Low Way                  Peregian Beach shared pathway link                                                                          Cost estimate Att No. 1
PW-8                                                                             • Provide Trunk path linkage connection   2026-2031      $272,319
          (Peregian Beach)               to Shire boundary                                                                                           Length 1,075m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Queen Street Extension to Royal                                                                             Cost estimate Att No.1
PW-9      Queen Street, Cooran
                                         Court.
                                                                                 • Provide Trunk path linkage connection   2021-2026       $46,150
                                                                                                                                                     Length 320m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Connection of missing Link from                                                                             Cost estimate Att No.1
PW-10     Reserve Street, Pomona
                                         Town Centre to Sports Park.
                                                                                 • Provide Trunk path linkage connection   2021-2026       $93,740
                                                                                                                                                     Length 650m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                                                                                                                                     Cost estimate Att No.1
PW-11     Hill Street, Pomona            Connection of missing Link              • Provide Trunk path linkage connection   2021-2026       $74,994
                                                                                                                                                     Length 520m
                                                                                   per Transport DSS
                                                                                 • PIP (September 2013)
                                         Connection of missing Link to Public                                                                        Cost estimate Att No.1
PW-12     Clay Street, Pomona
                                         School
                                                                                 • Provide Trunk path linkage connection   2021-2026       $54,804
                                                                                                                                                     Length 380m
                                                                                   per Transport DSS
                                         Park Road, Boardwalk Construction
                                                                                 • PIP (September 2013)                                              ATT 3 Noosa Heads - Park Rd
PW-13     Park Road, Noosa Heads         Upgrade Boardwalk from First Point                                                2016-2021    $6,500,000
                                                                                 • Capital Works Program 2017-2019                                   Boardwalk
                                         to National Park
                                         Noosa Parade Upgrade of Pathway         • PIP (September 2013)
                                                                                                                                                     Cost estimate Att No.1
PW-14     Noosa Parade, Noosa Heads      from Munna Point Bridge to Noosa        • Provide Trunk path linkage connection   2021-2026      $689,030
                                                                                                                                                     Length 2,720m
                                         Drive.                                    per Transport DSS


                                                                                                                                                                               5
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps(PDF, 23MB).pdf · 23.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.