2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps
Very large file: it may take a few minutes
The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
• PIP (September 2013)
Cost estimate Att No.1
PW-15 Rene Street, Noosaville Connection of missing Link • Provide Trunk path linkage connection 2021-2026 $48,131
Length 285m
per Transport DSS
• PIP (September 2013)
Cost estimate Att No.1
PW-16 Hoffman Drive, Noosaville Connection of missing Link • Provide Trunk path linkage connection 2021-2026 $33,776
Length 200m
per Transport DSS
• PIP (September 2013)
Seacove Court, Walter Hay Cost estimate Att No.1
PW-17 Connection of missing Link • Provide Trunk path linkage connection 2026-2031 $31,243
Drive, Noosaville Length 185m
per Transport DSS
• PIP (September 2013)
Connection of missing Link from Cost estimate Att No.1
PW-18 Gateway Drive, Noosaville • Provide Trunk path linkage connection 2014-2016 $39,687
Gateway Drive to Ventura Drive Length 235m
per Transport DSS
• PIP (September 2013)
Connection of missing Link Ventura Cost estimate Att No.1
PW-19 Ventura Drive, Noosaville • Provide Trunk path linkage connection 2026-2031 $80,218
Drive to Goodchap Street Length 475m
per Transport DSS
• PIP (September 2013)
Cost estimate Att No.1
PW-20 Moorindil Street, Tewantin Connection of missing Link to Ferry. • Provide Trunk path linkage connection 2026-2031 $78,529
Length 465m
per Transport DSS
• PIP (September 2013)
Att 5 Hilton Terrace Ernest
Connection of Missing Link from • Provide Trunk path linkage connection
PW-21 Hilton Terrace 2016-2021 $300,000 Street Intersection
Hilton Terrace and Ernest Street per Transport DSS
Improvements
• Capital Works Program
• PIP (September 2013)
Tewantin Foreshore pathway upgrade Att 4 Tewantin - Pathway &
• Provide Trunk path linkage connection
PW-22 Tewantin Foreshore and linkage from Town centre to Boat 2014-2016 $270,000 Lighting around Gallery &
per Transport DSS
Ramp Admin Bld
• Capital Works Program
Connection of Missing Link from • PIP (September 2013)
Cost estimate Att No.2
PW-23 Beckmans Road, Tewantin Noosaville State School to Cooroy • Provide Trunk path linkage connection 2026-2031 $607,968
Length 2,400m
Noosa Road. per Transport DSS
Total = $11,450,588
List of Pathway Project Attachments:
1. ATT 1 Cost Estimates
2. ATT 2 David Low Way, PEREGIAN - Pedestrian Refuge
3. ATT 3 Noosa Heads - Park Rd Boardwalk
4. Att 4 Tewantin - Pathway & Lighting around Gallery & Admin Bld
5. Att 5 Hilton Terrace Ernest Street Intersection Improvements
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.