2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                    • PIP (September 2013)
                                                                                                                                                        Cost estimate Att No.1
  PW-15     Rene Street, Noosaville          Connection of missing Link             • Provide Trunk path linkage connection   2021-2026      $48,131
                                                                                                                                                        Length 285m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
                                                                                                                                                        Cost estimate Att No.1
  PW-16     Hoffman Drive, Noosaville        Connection of missing Link             • Provide Trunk path linkage connection   2021-2026      $33,776
                                                                                                                                                        Length 200m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
            Seacove Court, Walter Hay                                                                                                                   Cost estimate Att No.1
  PW-17                                      Connection of missing Link             • Provide Trunk path linkage connection   2026-2031      $31,243
            Drive, Noosaville                                                                                                                           Length 185m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
                                             Connection of missing Link from                                                                            Cost estimate Att No.1
  PW-18     Gateway Drive, Noosaville                                               • Provide Trunk path linkage connection   2014-2016      $39,687
                                             Gateway Drive to Ventura Drive                                                                             Length 235m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
                                             Connection of missing Link Ventura                                                                         Cost estimate Att No.1
  PW-19     Ventura Drive, Noosaville                                               • Provide Trunk path linkage connection   2026-2031      $80,218
                                             Drive to Goodchap Street                                                                                   Length 475m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
                                                                                                                                                        Cost estimate Att No.1
  PW-20     Moorindil Street, Tewantin       Connection of missing Link to Ferry.   • Provide Trunk path linkage connection   2026-2031      $78,529
                                                                                                                                                        Length 465m
                                                                                      per Transport DSS
                                                                                    • PIP (September 2013)
                                                                                                                                                        Att 5 Hilton Terrace Ernest
                                             Connection of Missing Link from        • Provide Trunk path linkage connection
  PW-21     Hilton Terrace                                                                                                    2016-2021     $300,000    Street Intersection
                                             Hilton Terrace and Ernest Street         per Transport DSS
                                                                                                                                                        Improvements
                                                                                    • Capital Works Program
                                                                                    • PIP (September 2013)
                                             Tewantin Foreshore pathway upgrade                                                                         Att 4 Tewantin - Pathway &
                                                                                    • Provide Trunk path linkage connection
  PW-22     Tewantin Foreshore               and linkage from Town centre to Boat                                             2014-2016     $270,000    Lighting around Gallery &
                                                                                      per Transport DSS
                                             Ramp                                                                                                       Admin Bld
                                                                                    • Capital Works Program
                                             Connection of Missing Link from        • PIP (September 2013)
                                                                                                                                                        Cost estimate Att No.2
  PW-23     Beckmans Road, Tewantin          Noosaville State School to Cooroy      • Provide Trunk path linkage connection   2026-2031     $607,968
                                                                                                                                                        Length 2,400m
                                             Noosa Road.                              per Transport DSS
                                                                                                                               Total =    $11,450,588

List of Pathway Project Attachments:
     1. ATT 1 Cost Estimates
     2. ATT 2 David Low Way, PEREGIAN - Pedestrian Refuge
     3. ATT 3 Noosa Heads - Park Rd Boardwalk
     4. Att 4 Tewantin - Pathway & Lighting around Gallery & Admin Bld
     5. Att 5 Hilton Terrace Ernest Street Intersection Improvements




                                                                                                                                                                                      6
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 7 - Transport Network Future Projects & Maps(PDF, 23MB).pdf · 23.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗