Skip to the record
Every meeting, every word.

Original source · versioned page text

Town Planning Report

Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Cover letter, DA Form 1, Planning Report, Plans, Access Easement Plan, Approved POD,Coutour Survey, Landscape Plans, Engineering Plans) - MCU18/0120, RAL18/0013 & OPW18/0197.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 17686                                                                   July 2018



 Water Quality Management Plan that shall accompanying the application.
 comply with and address inter alia, the
 following issues in relation to the construction,
 establishment and operation phases of the
 development:
               •   All   necessary     erosion   and
                   sediment controls required. The
                   Erosion and Sediment Control
                   Plans shall cover all development
                   on site (during the construction,
                   establishment and operational
                   phases), ecological restoration
                   and remediation works.
               •   All     necessary     stormwater
                   treatment and water quality
                   devices associated with the
                   development shall be located
                   within the approved boundaries
                   of the lots and each development
                   precinct.
               •   Details of proposed locations and
                   dimensions       of     stormwater
                   treatment systems possible to
                   achieve     the     water   quality
                   objectives listed above.
               •   Details of stormwater reuse
                   strategies and detention devices
                   to ensure the hydrologic regime is
                   not altered from the current state.
               •   Details of proposed management
                   techniques to mitigate impacts
                   from     potential   uncontrolled
                   releases from the industrial uses
                   and the sewerage pump station.
                   Control    measures     shall  be
                   designed to prevent contaminants
                   such as heavy metals/toxic
                   chemicals leaving the site. These
                   measures shall be located outside
                   the vegetated buffer area.
               •   Details   of     monitoring and
                   reporting requirements to ensure
                   achievement of the listed water
                   quality objectives.
 The stormwater discharge from each lot site
 shall be designed such that there is no net
 increase in the rate of discharge as a result of
 the development for storm events up to 100
 year ARI.
 Acoustic Treatments                             The Noise Impact Assessment prepared by
 An Acoustic Report by an acoustic consultant to David Moore Acoustics for the adjoining site
Development Assessment Report                                                       Page 17 of 27
Material Change of Use, Reconfiguring a Lot, Operational Work
5, 12 and 18 Taylor Court, Cooroy
Lots 2 and 5 on SP197517 and Lot 1 on SP235189
Log in to download the original file

Town Planning Report.pdf · 986 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.