Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Town Planning Report

Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Cover letter, DA Form 1, Planning Report, Plans, Access Easement Plan, Approved POD,Coutour Survey, Landscape Plans, Engineering Plans) - MCU18/0120, RAL18/0013 & OPW18/0197.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 17686                                                                                 July 2018




 of rainwater collection from the roof areas and
 regulated trickle flow from Council’s reticulated
 supply.



7.3 OVERLAYS


The following overlays exist upon the site:

 Overlay                                                        Comment

 Biodiversity

                                                                The site contains a mapped watercourse and
                                                                drainage line subject to the Biodiversity
                                                                Areas Overlay. There is no evidence of this
                                                                watercourse on the site. The waterway
                                                                mapping is considered to be inaccurate and
                                                                does not reflect the site’s environmental
                                                                characteristics hence no further assessment
                                                                has been undertaken.




 Natural Resources

                                                                The site is identified as a resource
                                                                separation area and a water supply
                                                                catchment area subject to the Natural
                                                                Resources overlay.

                                                                The development will not adversely affect
                                                                the ongoing use of extractive or mining
                                                                industries and will not constrain the
                                                                transportation of such materials.

                                                                The development will not adversely impact
                                                                on the Lake Macdonald water supply. The
                                                                site is a committed urban development site
                                                                that is located above 98.5m AHD and can be
                                                                connected      to   sewer.     Appropriate
                                                                stormwater quality and erosion and
                                                                sediment control measures will be
                                                                incorporated into the development.




Development Assessment Report                                                                     Page 19 of 27
Material Change of Use, Reconfiguring a Lot, Operational Work
5, 12 and 18 Taylor Court, Cooroy
Lots 2 and 5 on SP197517 and Lot 1 on SP235189
Log in to download the original file

Town Planning Report.pdf · 986 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.