Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Town Planning Report

Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Cover letter, DA Form 1, Planning Report, Plans, Access Easement Plan, Approved POD,Coutour Survey, Landscape Plans, Engineering Plans) - MCU18/0120, RAL18/0013 & OPW18/0197.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 17686                                                        July 2018


PROJECT TEAM

Town Planning & Survey                    Project Urban

Design                                    Rhad Leonardi

Engineering                               HR Design Consulting Engineers

Landscape                                 James Birrell Design Lab

Geotechnical                              CSI Soil Testing




Development Assessment Report                                              Page 5 of 27
Material Change of Use, Reconfiguring a Lot, Operational Work
5, 12 and 18 Taylor Court, Cooroy
Lots 2 and 5 on SP197517 and Lot 1 on SP235189
Log in to download the original file

Town Planning Report.pdf · 986 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.