Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Town Planning Report

Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Cover letter, DA Form 1, Planning Report, Plans, Access Easement Plan, Approved POD,Coutour Survey, Landscape Plans, Engineering Plans) - MCU18/0120, RAL18/0013 & OPW18/0197.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 17686                                                                       July 2018




2.0 INTRODUCTION

This Development Assessment Report has been prepared on behalf of Hass Holdings Pty Ltd
(A.C.N. 151 952 653) as Trustee to support a combined Development Application for the
following:

    •    Material Change of Use (Industrial Business – Type 2 production, alteration, repackaging
         and repairing);

    •    Reconfiguring a Lot (access easements); and

    •    Operational Work (engineering works and landscaping).

The subject site is situated at 5, 12 and 18 Taylor Court, Cooroy, and is described as Lots 2 and 5
on SP197517 and Lot 1 on SP235189.

The site is in the Urban Footprint of the SEQ Regional Plan. The Noosa Plan includes the site in
the Cooroy and Lake Macdonald locality and the Industry Zone. The site forms part of the
Nandroya Industrial Estate which was approved by the Noosa Council in November 2006. That
approval included a Plan of Development which included a Supplementary Table of Development
Assessment that identified the Industrial Business Type 2 use as being a preferred use for the
estate. This land use is subject to code assessment under the supplementary table of assessment.

Reciprocal access easements are proposed over Lots 1 & 2 over a new cul-de-sac extending from
Taylor Court. These easements will also benefit Lot 5. Operational Works approval is sought for
all works associated with the cul-de-sac extension and all civil and landscape works associated
with the Industrial Business – Type 2.

The purpose of this report is to describe the characteristics of the site and surrounding land uses,
detail the proposed development and provide an assessment against the applicable planning
provisions.

This report should be read in conjunction with the accompanying covering letter, IDAS
Development Application forms, Proposal Plans, Access Easement Plan, Contour and Detail
Survey, Landscape Plans, Engineering Plans, Stormwater Management Plan and Commercial Site
Investigation Data and Classification Report.




Development Assessment Report                                                             Page 6 of 27
Material Change of Use, Reconfiguring a Lot, Operational Work
5, 12 and 18 Taylor Court, Cooroy
Lots 2 and 5 on SP197517 and Lot 1 on SP235189
Log in to download the original file

Town Planning Report.pdf · 986 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.