s290(1)(b) Amended concurrence agency response · OPW13/0583
SDA-0813-003915
Our reference: SDA-0813-003915
Your reference: n/a
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Operational Works
Schedule 7, Table 2, Item 15 – Tidal works, or development in a coastal management
district (Marine Safety) and Schedule 7, Table 2, Item 15A – Tidal works, or development
in a coastal management district (Marine Pollution); Department of Transport and Main
Roads (Maritime Safety Queensland).
1. (a) The construction, operation or maintenance of the
structure must not impede the safe navigation of other At all times
ships or restrict safe access to or from neighbouring
structures. AND
(b) Any ship moored at this pontoon/jetty must not impede
the safe navigation of other ships or restrict access to or
from neighbouring structures
2. The applicant must dispose of any obstructions and debris At all times during
encountered while undertaking the works. This work is construction
to be undertaken at no expense to the Department of
Transport and Main Roads and in accordance with the
Harbour Master’s direction.
3. The structure and any part thereof must not extend beyond At all times
that of neighbouring approved structures.
The structure must be adequately lit and all lighting must At all times
4.
be positioned so that it does not cause a risk to the safe
navigation of other ships. Any freestanding piles must
have retro-reflective tape fitted.
All navigation lights, buoys, marks or signs associated
with the development must be supplied, installed and
maintained in accordance with the Department of
Transport and Main Roads through Maritime Safety
Queensland’s requirements. Please contact Maritime
Safety on 07 3632 7500 for information regarding these
requirements.
No part of the approved pontoon structure or any ship
5. berthed at the approved pontoon structure is to encroach At all times
within 1.5metres of the allocated water space. The
approved boat ramp structure is to be positioned as per the
approved plans and use of the approved structures is to be
as shown on the submitted Site Plan, Layout and Water
Allocation, Drawing No. JSP-SJ-25800, Issue B prepared by
Cardno for The Jetty Specialist on 27 March 2013.
6. At all times
Any ship, berthed, moored or attached to the pontoon/
structure must not exceed the following sizes:
Wet berth – length overall:8.0m; beam: 3.4m
Department of State Development, Infrastructure and Planning Page1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
s290(1)(b) Amended concurrence agency responseRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.