Skip to the record
The gold standard in government transparency.

Council archive · source document

s290(1)(b) Amended concurrence agency response · OPW13/0583

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                 SDA-0813-003915




Schedule 7, Table 2, Item 13 – Tidal works, or development in a coastal management
district (Coastal Protection and Management); Department of Environment and Heritage
Protection

   7.       All works are to be constructed in accordance with the            At all times
            attached approved drawings and specifications
   8.       Best practice erosion and sediment control measures must          During
            be implemented and maintained to minimise erosion and             construction
            the release of sediment
   9.       Acid sulphate soils must be managed such that                     During
            contaminants are not directly or indirectly released to any       construction
            land or waters
   10.      Should acid sulphate soils be discovered they must be             At all times
            treated and managed in line with the latest edition of the
            Queensland Government’s Instructions for the Treatment
            and Management of Acid Sulfate Soils, 2001.
   11.      Any material to be excavated from the tidal area during           During
            construction and determined to not be Acid Sulfate Soils,         construction
            must be retained on the beach in front of the lot.

Schedule 7, Table 2, Item 27 – Work or other development in or adjoining a fish habitat
area; Department of Agriculture and Fisheries and Forestry.

   12.      Written notice of the date of commencement of                     Prior to the
            development works must be provided to Fisheries                   commencement
            Queensland via [email protected] at             of development
            least five (5) business days but no greater than twenty (20)
            business days prior to the commencement of development
            works. The email must contain a subject heading and
            other information clearly identifying the permit and works
            to which the notification applies

   13.      A sign must be displayed around the development works             Prior to, during
            site, in a position where the sign is clearly visible to the      and after
            public, for at least five (5) business days prior to the          development
            commencement, during and for 5 business days after all
            fisheries development works. The sign is to be removed 5
            business days after the completion of the works. Each sign
            must state: “Development on land that adjoins a declared
            fish habitat area authorised under Development Approval
            Reference No.SDA-0813-003915. Fisheries Qld Tel. No.
            [132523]".



   14.      After completion of the tidal works, all areas of the bed         On completion of
            and banks of the stream outside the approved permanent            development
            footprint of works should be returned to their original profile
            and stabilised to promote regeneration of natural fish
            habitats.



Department of State Development, Infrastructure and Planning                         Page2

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

s290(1)(b) Amended concurrence agency response.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.