INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3. LI (i) devetopment on land contiguous* to a State controlled road and for -
Unless you answered ‘none of the above” fo Q2, = . . .
the application triggers referral to the Department} (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. — (J (b) reconfiguring a fot unless -
In certain circumstances DMR will be an advice : . .
agency, while in other circumstances DMR wil « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Scheie 2 ofthe F Reewlation wt assistyou to Ol} operational work (not associated with @ material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LD (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use -
« assessable against the local government’s planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CJ (b) reconfiguring a tot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above}-
« assessable against the iocal government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
{1 (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. oO (i) material change of use -
Unless you answered “none of the above’ to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water b) on alot containing —
Department of Natural Resouces and Water tb) 9 Z
tan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
concurence agency forthe appicaion in elation (c) where the existing use of the land is a rural or environmental use; and
if you ticked (3() of (i, your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Teferral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. .
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c} where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Li (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a jot mentioned in (ii) - complete Part J of
Form 1
EX] (iv) _ none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked (ii) Queensland Transportis a
concurrence agency for the application.
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part of Form 1
BX] (iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.