Skip to the record
The gold standard in government transparency.

Council archive · source document

07/1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published] · 142007.1992

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Acid, sulfate soils
For more information refer to Guide 10.

Unless you answered “none of the above” to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

lf an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)
C1 (i) below 20m AHDS and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or
C (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

KX (iii) none of the above

 

 

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

lf you answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
elation to this matter.

 

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

INO

(YES - complete Part L of Form 1

 

Water related development under the
Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

The application involves:

C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

CJ (a) in a watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, Ka, Ks, Ke, or Ks of Form 1 whichever is applicable,

[1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;

(1c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 1;

(Cd) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ki of Form 1;

(1 (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;
Off

for interfering with overland flow water in a drainage and embankment area -
complete Part K1o of Form 1
(1 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
EX] (ii) none of the above.

 

 

Removal of quarry material from a
watercourse
For more information refer to Guide 16,

If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

if an agency other than NRWis the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

KI NO

(11 YES - complete Parts Kr and G of Form 4

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

Referable dam is defined under the Water Act 2000.

6
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8
9

Watercourse is defined in sch 10 of the IPA.

Page 3

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.