Council archive · source document
Town_Planning_Report · MCU19/0055
MATERIAL CHANGE OF USE AND OPERATIONAL WORKS TO ESTABLISH MULTIPLE HOUSING (TYPE 2 DUPLEX) 10 27 HILL STREET, SUNSHINE BEACH 5 Statutory Framework 27. This section of the Town Planning Report describes the statutory planning framework applicable to the proposed development application. 28. Table 3 below outlines the applicable State Mapping Triggers, which require consideration as part of this Town Planning Report. In addition to this Table 3 details whether the application requires referral to any Referral, or, Advice Agencies as part of the application. Table 3 Statutory Framework Mapping Layers State Planning Policy Benchmark » Natural Hazards Risk & Resilience Mapping o Flood Hazard Area - Local Government Flood Mapping Area Regional Plan South East Queensland Regional Plan 2017 – Urban Footprint SARA DA Mapping » Water Resources o Water Resource Planning Area Boundary » Unexploded Ordnance o Areas with Substantial potential for UXO Non-SARA DA Mapping Nil Referrals This application will require referral under Schedule 10, Part 4, Division 2, Table 1 of the Planning Regulation 2017 given its identified as an ‘area with substantial potential for UXO. 5.1 The Planning Act 2016 29. The Planning Act 2016, came into effect on 3 July 2017 and replaces the previous Sustainable Planning Act 2009. The Planning Act 2016 provides the overall statutory planning framework for Queensland. 30. The proposed Development Application has been made under the Planning Act 2016, as well as all subordinate legislation. 5.2 State Planning Policy 31. The proposed development is located on a site which is mapped as containing the following State Planning Policy matters: • Natural Hazards Risk & Resilience o Flood Hazard Area – Level 1. 32. With consideration to the above SPP mapping trigger, the proposed development is not located within a Flood Hazard Area under the scheme, therefore the development does not compromise the outcomes sought by the SPP. 5.3 Regional Plans 5.3.1 South East Queensland Regional Plan 2017 33. The South East Queensland Regional Plan 2017 (hereafter; SEQRP) is the principal planning document for managing growth and development within the South East Queensland region. The subject sites are located within the Urban Footprint designation of the SEQRP. ANDREW PANNIFEX MAY 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town_Planning_Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.