Council archive · source document
08 Original Approval Notice 1988 · 51981.4258.01
LETTER TO MORRIS FLETCHER & CROSS, DATED 20TH JULY, 1988. RE: TPC 1441.-2. 10. The open space and setback areas are to be landscaped in accordance with the Noosa Design Manuel and a properly prepared landscaping plan to be submitted to and approved by the Shire Planner, prior to the issue of sa Building Approval. Such landscaping is to be completed in accordance with the approved landscaping plan, prior to the premises being occupied and méeintained et all times thereafter to the reasonable satisfaction of the Shire Planner. Existing trees are to be retained, except where required to be removed due to building operations or the conduct of the approved use. Areas of existing trees proposed to be retained on site are to be depicted upon the lendsceping plans submitted in accordance with condition 4 above, for approval by the Shire Planner. Construction work is permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday, except where extended hours are approved by the Building Surveyor. Payment of contributions in eccordance with Council's Policy on Water Supply end Sewerage Headworks, current at the time of Building Approvel. Calculations based upon the current Policy including Price Index variation as at June, 1988 are estimated as follows:- Water Supply - $36,989 Sewerage - $14,833 TOTAL: $51,822 If payment is not proposed to be made prior to the issue of Building Approval, a cash bond or trading bank guarantee for the required amount is to be lodged prior to the release of that Approval. The contribution is then required to be made within fourteen (14) days of the issue of Building Approval. Construction of roadworks, drainage and footpath improvements across the full frontage of the development to the satisfaction of the Shire Engineer. Such works shall involve the construction of kerb and channel, bitumen widening, essociated drainage, hot mix correction to the existing pavement, where required and footpath upgrading works in accordance with Council's forward planning intentions for the area. In this regerd, plans prepared by a registered Civil Engineer are to be submitted to and approved by the Shire Engineer, prior to commencement of construction. The developer shall bear the cost of alteration of any public utility or facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council's existing water supply and sewerage systems at the developer's expense to the standards and requirements of Council's Shire Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08 Original Approval Notice 1988.pdfRelated documentApplication case desk ↗
About this file
- File size
- 897 KB (small file)
- File type
No other editions are linked here.