Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08 Original Approval Notice 1988 · 51981.4258.01

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LETTER TO MORRIS FLETCHER & CROSS, DATED 20TH JULY, 1988. RE: TPC 1441.-2.

 

10.

The open space and setback areas are to be landscaped in accordance
with the Noosa Design Manuel and a properly prepared landscaping plan
to be submitted to and approved by the Shire Planner, prior to the
issue of sa Building Approval. Such landscaping is to be completed in
accordance with the approved landscaping plan, prior to the premises
being occupied and méeintained et all times thereafter to the
reasonable satisfaction of the Shire Planner.

Existing trees are to be retained, except where required to be removed
due to building operations or the conduct of the approved use. Areas
of existing trees proposed to be retained on site are to be depicted
upon the lendsceping plans submitted in accordance with condition 4
above, for approval by the Shire Planner.

Construction work is permitted only during the hours of 7.00 a.m. to
6.00 p.m. Monday to Saturday, except where extended hours are approved
by the Building Surveyor.

Payment of contributions in eccordance with Council's Policy on Water
Supply end Sewerage Headworks, current at the time of Building
Approvel. Calculations based upon the current Policy including Price
Index variation as at June, 1988 are estimated as follows:-

Water Supply - $36,989
Sewerage - $14,833

 

TOTAL: $51,822

If payment is not proposed to be made prior to the issue of Building
Approval, a cash bond or trading bank guarantee for the required
amount is to be lodged prior to the release of that Approval. The
contribution is then required to be made within fourteen (14) days of
the issue of Building Approval.

Construction of roadworks, drainage and footpath improvements across
the full frontage of the development to the satisfaction of the Shire
Engineer. Such works shall involve the construction of kerb and
channel, bitumen widening, essociated drainage, hot mix correction to
the existing pavement, where required and footpath upgrading works in
accordance with Council's forward planning intentions for the area. In
this regerd, plans prepared by a registered Civil Engineer are to be
submitted to and approved by the Shire Engineer, prior to commencement
of construction.

The developer shall bear the cost of alteration of any public utility
or facilities necessitated by the development of the land or
associated construction works external to the site.

Connection to Council's existing water supply and sewerage systems at
the developer's expense to the standards and requirements of Council's
Shire Engineer.

Used in these records

About this file

File size
897 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08 Original Approval Notice 1988.pdf · 897 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.