Skip to the record
The only place to find full transcripts.

Council archive · source document

10/0367 - Op Works - Transport Type 5 [As Published] · 142010.367

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DIO

 

 

 

 

 

1. 6. Is any of the proposed operational work listed in-schedule. 12:of.the Sustainable Planning Regulation
4 2009 and does it exceed the specified threshold? Ft oe me een
i} No
Cre . This application requires assessment by the Department of Transport and Main Roads as a
s concurrence agency

 

 

 

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

 

1.7 ‘ts any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
_ «2009 and does it exceed thespecified threshold?

 

 

KX] No

 

. This application requires assessment. by the Dépariment of Transport and Main Roads as a
concurrence agency  ®

(7 Yes

 

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 7, table 3, item 15

 

Istany; part of the premises’ in-an ‘interim, koala habitat ‘protection area a idefitified
_ Queensland Koala State planning regulatory brovisions (SEG Koala SPRP)?.." we

     

der: theiSouth Fast

  

 

 

BN

 

{tis recommended that you complete part 5 of this checklist.

Cy Yes’ |e

 

 

 

ny of. the: propesed. operational work associated with reconfiguring a lot and the: ‘reconfiguration i is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
   

Water Act 2000; for taking or Interfering With: ‘water from a watercourse, ‘take, or spring (other. than.

. 1X} No
= Yes ° It is recommended that you complete part 7 of this checklist.
i {ls any of the proposed operational work for any thing. constructed or ‘installed. that allows, under the € r

( vor.from adam constructed ona ‘watercourse. or ‘lake? ‘ wo ag

 

 

X] No

- It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

 

(1 Yes

 

It is recommended that you complete part 8 (starting from question 8.1) of this checklist.

 

AD tae

 

1412

Is any of the proposed operational work tidal’ work, other than excluded '
Sustainable Planning ‘Regulation’ 2009? on Vg ny ra

  

rk défiried under the ‘
me ES

 

 

 

{X] No

 

 

(Yes

 

It is recommended that you complete part 9 of this checklist.

 

 

 

Operational works - IDAS checklist 4 .
Version 1.0 December 2009 ‘ng

Used in these records

About this file

File size
884 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0367 - Op Works - Transport Type 5 [As Published].pdf · 884 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.