10/0367 - Op Works - Transport Type 5 [As Published] · 142010.367
LILI
113°
Is any of the operational Work proposed -to- be carried. out within a coastal management district?
—X] No
C1 Yes
* It is recommended that you complete part 10 of this checklist.
1.14
Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 19947
X] No
(Yes
. {t is recommended that you compiete part 11 of this checklist.
ie
“4!
Was
,|s,any of the proposed perational work'to. be: ‘carried. out completely ‘ or partly within, a declared fish |
c habitat atea under the Fisheties'Act 19942) 4206s" 4. Mp 38 % :
—X] No
[Yes
(1 Yes .
It is recommended that-you complete part 13 of this checklist.
TAI:
Ree
\ Rivers. Act 2005? ° ee ey vt a
‘Is any ‘of the operational work proposed to'be carried out ina wild river area declared under the Wild.
° it is recommended that you complete part 14 of this checklist.
X] No
[7] Yes
° {t is recommended that you complete part 15 of this checklist.
Seinze State-controlled ‘roads: .. *: .,".
a a a
re
2.1. - Is'the proposed operational work for filling or excavating listed inthe. Sustainable Planning
” ‘Regulation: 2009 schedule: 14. and does it exceed the threshold or combined threshold?
—X] No ° End of part 2 of this checklist.
C1 Yes . This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency. —_
. End of part 2 of this checklist. 8
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2
Part 4 - Easements and Substations | '
Operational works - IDAS checklist 4
Version 1.0 December 2009
¥
Loe tagt
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0367 - Op Works - Transport Type 5 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 884 KB (small file)
- File type
No other editions are linked here.