Council archive · source document
10/0367 - Op Works - Transport Type 5 [As Published] · 142010.367
LL Ltr oi any y part “of the: premises subject-to.an.easement in favour of the holder.of Pipeline Licence Number “4 issued under the Petroleum Act 1923 for the construction or >r Operation ‘of the Moonie to Brisbane ~~ strategic pipeline? No e¢ * — End of part 4 of this checklist. (Yes . This application requries assessment by the pipeline licence holder as an advice agency. Section reference: Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17 Part 8 - Taking. or interfering with water. . You must complete Taking artesian or sub-artesian water - IDAS form 12. . This application requires assessment by the Department of Environment and Resource Management as a concurrence agency. for the construction of a referable dam as defined under the Water Supply (Safety © Yes 1 No and Reliability) Act 2008 to increase the storage capacity of a referable dam by more than 10 per cent & Yes (0 No If yes to any of the above you must complete Referable dam - IDAS form 16. This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be asa concurrence agency and you must give DERM a copy of the application Operational works - iDAS checklist 4 Version 1.0 December 2009 a 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0367 - Op Works - Transport Type 5 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 884 KB (small file)
- File type
No other editions are linked here.