                      e.      Landscaping, including all assets and improvements within parks, open space and road
                              reserves areas are to be shown on an accompanying separate landscape plan
                              (prepared in .dwg file format with accompanying hardcopy PDFs) and include a
                              complaint ADAC XML file. Details of the landscaping and all associated assets and
                              improvements may be included in the ADAC XML digital file prepared for associated
                              civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
                              containing landscape and asset information only.
                      f.      The building envelope data must be submitted in both hardcopy and digital format
                              (ADAC XML Digital File). ADAC - Asset Design As Constructed, is to be prepared in
                              accordance with industry standards and recorded in “MGA - UTM56 / GDA94”
                              projection.
                      On Maintenance
               53.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
                      Maintenance’, the supervising RPEQ must submit to Council:
                      a.      Certification that all works have been undertaken and completed in accordance with
                              the requirements of this Permit;
                      b.      As Constructed details in accordance with Council’s Planning Scheme Policy; and
                      c.      Maintenance and operational manuals for all proprietary or site specific devices.
                      Off Maintenance
               54.    Prior to requesting an Off Maintenance inspection the developer must provide a written
                      request for the Off Maintenance inspection.
               55.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      A Council inspection reveals works do not comply with approval requirements;
                      b.      Submitted certification falsely states works comply with approval requirements.
                      ADDITIONAL CONDITION – 2 December 2021
               56.    Prior to the prestart meeting, provide a written agreement between the Developer and the
                      property owner(s) of No. 133 Lake Weyba Dr in regard to the potential impacts to their
                      frontage and crossover resulting from the construction of the necessary electrical
                      infrastructure. The agreement must address the extent of the reinstatement works and a copy
                      of the co-signed agreement must be submitted to Council.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction.
               2.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.




                                                                                                       Page 10 of 14
Document Set ID: 21713731
Version: 5, Version Date: 06/12/2021

Used in these records

About this file

File size
220 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_21713731_v5_Negotiated Decision Notice OPW21 0134.pdf · 220 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.