                      g.      Ensure mulch is placed around each tree, comprising of leaf and limb material of
                              varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment
                              contamination and is applied to all planting areas to ensure a minimum 100mm depth
                              once settled.
                      *(Refer to Advisory Note)
               Weed Management
               49.    Weed control and management works must be undertaken in accordance with the approved
                      Vegetation Management Plan including the ongoing management of Singapore Daisy.
               Bushfire Management
               50.    All works must be undertaken in accordance with the relevant requirements of the approved
                      Bushfire Management Plan.
               FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
                      Certification
               51.    Upon completion of the work and prior to signing the plan of survey, the following
                      certifications must be provided to Council:
                      a.      A certificate issued by an RPEQ certifying that the works have been constructed in
                              accordance with the Operational Works permit and the requirements of the Bushfire
                              Management Plan.
                      b.      A certificate issued by the Project Arborist certifying that the works have been
                              undertaken in accordance with this approval and the requirements of the approved
                              Vegetation Management Plan.
                      As Constructed Plans and ADAC XML Files (Council)
               52.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                      information shall include:
                      a.      As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                              file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                              accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                      b.      ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                              prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                              GDA94” projection.
                              Please Note: Further information and advice relating to the as-constructed drawing
                              presentation, as-constructed survey capture and associated guidelines for preparation
                              of a compliant ADAC XML digital file are available on the webpage titled “As-
                              Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
                              Development / Development Tools & Guidelines / As-Constructed Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              i.       Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              ii.      Licensed Surveyor in regard to the cadastral and locational information, levels
                                       and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels.




                                                                                                        Page 9 of 14
Document Set ID: 21713731
Version: 5, Version Date: 06/12/2021

Used in these records

About this file

File size
220 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_21713731_v5_Negotiated Decision Notice OPW21 0134.pdf · 220 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.