Site Access and Driveways
27. The communal driveway crossover must be constructed in accordance with Council’s
Standard Drawing RS-056 & RS-056.1.
28. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete;
b. The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties;
c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;
d. The property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage. The developer is responsible for any necessary relocation
of existing services to provide this clearance and must contact the relevant service
authorities and comply with their requirements in relation to these works.
Earthworks and Retaining Walls
29. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing
the Plan of Survey.
30. Fall protection must be provided to retaining walls that are over 1m high.
31. Any retaining walls within the bushfire protection zone shown in Figure 6.1 of the approved
Bushfire Management Plan, must be constructed with non-combustible or fire resisting
materials in accordance with the Bushfire Management Plan.
32. Slope and batters are a maximum grade of:
a. 1 in 4 for grassed areas;
b. 1 in 3 for planted areas; and
c. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
33. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
34. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g. by blocking or interfering with natural overland flows).
35. The fill works undertaken must not result in any ponding of stormwater within the proposed
lot or on adjacent lots. Any reshaping works required to prevent ponding must be effectively
stabilised with turf or equivalent stabilisation method.
36. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
37. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
Page 6 of 14
Document Set ID: 21713731
Version: 5, Version Date: 06/12/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_21713731_v5_Negotiated Decision Notice OPW21 0134.pdfRelated documentApplication case desk ↗
About this file
- File size
- 220 KB (small file)
- File type
No other editions are linked here.