Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193

of 53

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME

41 ls gfy of the proposed operational work assessable under a planning scheme?

 

 

 

 

No - Go to 04.2 (1 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

STATE-CONJROLLED ROAD

414 Ay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

(No (1 Yes - This application must be referred to the Depariment of Main Roads (DMA) as Concurrence Agency.

Ces

If yes, is all of the proposed operational work associated with the following?
(i) Amaterial change of use that is assessable under the planning scheme CINo [7] Yes

(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [-]No (] Yes
abutting the State-controlled road

If no to either or both (i) or (ii) above - Answer (a) - (c) below

(a) 1s any of the proposed operational work associated with access to a State-controlled road?

No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
CNo Yes .

If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo] No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
D Yes - This-application must be referred to OMR as Advice Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,

through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlied road?
[LINo Yes

It yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
O Yes - This application must be relerred to OMR as Advice Agency.

IP Aegulahc scPedute 2 tate 5 tert 3 4P Reawlanon, seneawe 2 tate 3.185 1,0)

ACID SULFATE SOILS
4.1.2 oye the operational work proposed in a focal government area listed* in State Planning Policy 2/02: Planning and Managing

 

 

Dgfelopment Involving Acid Sulfate Soils?
No -Gotoa4.1.3 ([] Yes

It yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

CI No C1 Yes
it yes, does the proposed operational work involve the following? .
(i) Excavating more than 1,000m: of soil or sediment at or below 5m AHD (No (1 Yes

(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on [No (1 Yes
land, soil or sediment at or below 5m AHD

If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency

mH ig Poot y 2 Oo Porsing.

Rey G0 owe =

 

ter S. State Por

 

 

 

Wp 99 Dene rement te gh

 

Bu te Svs

   

 

 

«1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervay Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsvilte, Whitsunday

Page 27

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1193 - Operational Works - Access, Car Parking [As Published].pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.