Council archive · source document
08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 SECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work. PLANNING SCHEME 41 ls gfy of the proposed operational work assessable under a planning scheme? No - Go to 04.2 (1 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below. STATE-CONJROLLED ROAD 414 Ay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? No If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold? (No (1 Yes - This application must be referred to the Depariment of Main Roads (DMA) as Concurrence Agency. Ces If yes, is all of the proposed operational work associated with the following? (i) Amaterial change of use that is assessable under the planning scheme CINo [7] Yes (ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [-]No (] Yes abutting the State-controlled road If no to either or both (i) or (ii) above - Answer (a) - (c) below (a) 1s any of the proposed operational work associated with access to a State-controlled road? No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. (b) Is any of the proposed operational work for filling or excavation? CNo Yes . If yes, is the operational work proposed in a future State-controlled road not defined by route? Oo] No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency D Yes - This-application must be referred to OMR as Advice Agency. (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlied road? [LINo Yes It yes, is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. O Yes - This application must be relerred to OMR as Advice Agency. IP Aegulahc scPedute 2 tate 5 tert 3 4P Reawlanon, seneawe 2 tate 3.185 1,0) ACID SULFATE SOILS 4.1.2 oye the operational work proposed in a focal government area listed* in State Planning Policy 2/02: Planning and Managing Dgfelopment Involving Acid Sulfate Soils? No -Gotoa4.1.3 ([] Yes It yes, is the natural ground level of any point where work is being carried out less than 20m AHD? CI No C1 Yes it yes, does the proposed operational work involve the following? . (i) Excavating more than 1,000m: of soil or sediment at or below 5m AHD (No (1 Yes (ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on [No (1 Yes land, soil or sediment at or below 5m AHD If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as Advice Agency mH ig Poot y 2 Oo Porsing. Rey G0 owe = ter S. State Por Wp 99 Dene rement te gh Bu te Svs «1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas, Fitzroy, Gladstone, Gold Coast, Hervay Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsvilte, Whitsunday Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.