Council archive · source document
08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
EASEMENTSAND SUBSTATIONS
4.13
Ary of the proposed operational work for filling or excavation?
No -Gotoaa14 (_] Yes
It yes, is the filling or excavation associated with reconfiguring a lot?
LI Yes (J No - Answer both (a} and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
[No (Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
(LINo [1 Yes - this application must be referred to the entity as Advice Agency.
{b) Is any of the operational work proposed to be focated within 10m of a substation site under the Electricity Act 1994?
(No LD Yes - this application must be referred to the entity responsible lor the substation as Advice Agency.
!P Sequtubon. sched Mex FOr, ¢ hee 8S ae 3 den 7D
444
Is afy part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Agt 1923.for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Goteas15 [1 Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
LJ No O Yes
It yes, is any of the operational work proposed to be located in any part of the easement?
No CD Yes - rhis application must be referred to the licence holder as Advice Agency.
fon egnegy'sL
Biter iF |
PUBLIC PASSENGER TRANSPORT
415
sfecitied threshold?
No ~ Go 10 04.1.6 (1 Yes - This application must be referred to Queensiand Transport (QT) as Concurrence Agency.
iP Gegu
ls fs of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
. Scheuuse @ labie 3 Rem 14.
RAILWAY SAFETY AND EFFICIENCY
4.16
specified threshold?
ee of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
No ~ Go 0 04.1.7 (77 Yes - This application mus! be referred to Queensland Transport (OT) as Concurrence Agency.
AP Re idisOn SONA. e 2 tabi 3 fan i$
KOALA CONSERVATION
4.17
ary part of the premises in a koala conservation area or koala sustainability area?
No - Go 0.04.2 C1 Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes to all questions in either Q2. 1.8 or Q 3.12)?
LD Yes - Go 04.2 CINo
{f no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
(Yes -Gotoas2 [No
If no, will the activity result in the following?
{i} Clearing of native vegetation over an area greater than 2,500m? ‘CNo [Yes
(ii) Extracting gravel, rock of sand from an area greater than 5,000m? CINo [1 Yes
{iil} Excavating or filling an area greater than 5,000m? : CINo : L Yes
Hf yes to one or more of (i} — (iii) above - This application must be referred to the Environmental Protection Agency (EPA} as
Concurrence Agency.
iP Beg alan soho gen Fe OE
WILD RIVER AREA - although legislation provides tor assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005,currently na declarations for any of the wild river areas apply the Wild Rivers code to that type of development.
Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.