Council archive · source document
Delegated Report - Code - Planning MCU24/0125 (As Published)
With reference to PO21(d), the issue of amenity impacts to the neighbouring dwellings at 2, 2A,
2B and 6 Starboard Avenue, this was raised in Council’s Information Request. The applicant’s
response recommended that a detailed lighting plan be provided as part of the Building Approval.
A condition will be imposed as part of any full development permit to ensure all outdoor lighting
complies with Australian Standard AS4282. This standard sets the guideline for mitigating the
obtrusive effects of outdoor lighting and provides recommended limits for relevant lighting levels to
contain these effects within tolerable levels. Furthermore, along the southern extent of the existing
access handle, there is an existing dense hedge that will effectively screen the adjoining properties
from light spillage. Blockwork fencing and landscaping will also effectively reduce light spill from
reducing the amenity of the existing dwellings on 2A and 2B Starboard Avenue.
It is noted that the proposal to increase the number of Medium Density Residential Zoned lots
gaining access from this rear lot does not meet PO21(b) of the Reconfiguring a Lot Code.
Notwithstanding this, the non-compliance with PO21(b) meets the purpose and overall outcomes
of the Reconfiguring a Lot Code because the rear lots were created before the land was upzoned
and is therefore consistent with the established and emerging character of the local area. The
emerging character of the area provisions for higher densities and is therefore likely to result in
more lot being created from an existing rear lot.
Water Quality and Drainage Code
Acceptable Outcome AO2.1-AO2.4 of the Water Quality and Drainage Code state:
AO2.1 Stormwater drainage planning, design and construction is in accordance with PSP6
Engineering Design Standards - Roads, drainage and earthworks and the latest
version of the Queensland Urban Drainage Design Manual.
AO2.2 The stormwater drainage system connects to a lawful point of discharge in accordance
with PSP6 Engineering Design Standards - Roads, drainage and earthworks.
AO2.3 Stormwater flows discharging from the development are demonstrated to be consistent
with pre-development characteristics.
AO2.4 Development provides for the management of stormwater to incorporate appropriate
allowance for climate change impacts (including rainfall intensity and sea level rise), in
accordance with PSP6 Engineering Design Standards – Roads, Drainage and
Earthworks.
The proposal does not meet these Acceptable Outcomes and as such does not comply with these
provisions of the code. The proposal is therefore required to comply with corresponding
Performance Outcome PO2 of the Water Quality and Drainage Code, which states:
PO2 Stormwater drainage infrastructure is planned, designed and constructed to:
(a) incorporate allowance for increased flood risk and tidal inundation through
pipework as a result of climate change and sea level rise;
(b) ensure the development is adequately drained; and
(c) ensure stormwater is managed and lawfully discharged without altering
stormwater drainage characteristics external to the site.
Council’s Information Request raised issues regarding the external drainage impacts that the
development would cause. The assessment did not consider the impacts on all parts of the
drainage network external to the site.
The response to Council’s Information Request did not sufficiently resolve issues relating to
stormwater management, specifically allowances for climate change and demonstrating a ‘non-
worsening’ outcome that assessed like-for like scenarios for climate change scenarios, based on
the 1% AEP event (2100).
Council’s Senior Development Engineer has also considered the proposed stormwater solution
and has provided advice in his assessment in section 4.2 below.
Page 13 of 18
Document Set ID: 23672855
Version: 9, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24/0125 (As Published)Related documentApplication case desk ↗