Delegated Report - Code - Planning MCU24/0125 (As Published)
This outcome is not supported and must be addressed as part of the conditions of this preliminary
approval.
Waste Management Code
Acceptable Outcome AO1.1 and AO1.2 of the Waste Management Code state:
AO1.1 Construction, operational and demolition works are planned and managed in
accordance with Planning Scheme Policy PSP9 Waste management.
Editor’s Note— PSP9 Waste Management requires Waste Management Plans to be
prepared as part of certain types of development applications to ensure proper
consideration is given to waste minimisation, segregation and reuse.
AO1.2 Adequate area is provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams
during construction or demolition works and the operational phase of development.
The proposed waste storage areas do not meet the requirements of these Acceptable Outcomes
of the code. The proposal is therefore required to comply with corresponding Performance
Outcome PO1 of the Waste Management Code, which states:
PO1 Development that generates several classes of waste is designed so waste is
collected, stored and disposed of in a safe and ecologically sustainable manner.
The proposed development did not demonstrate compliance with PSP9 Waste Management, and
the applicant did not provide a Waste Management Plan demonstrating that all waste servicing
and collection can occur onsite.
The refuse/recycling areas associated with the development must occur in locations that minimise
the amenity impact on adjacent properties.
The submitted information for the provision of onsite servicing did not demonstrate that a Refuse
Collection Vehicle could enter and exit the site in a forward gear while remaining wholly within the
access driveway (i.e., the access handle to Starboard Avenue).
Council’s Senior Development Engineer has also considered the proposed waste solution and has
provided advice in his assessment below.
The outcome proposed by the applicant is not supported and must be addressed as part of the
conditions of this preliminary approval.
4. CONSULTATION
4.1. Referral Agencies
Not Applicable
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Development Engineer, Development Assessment
• Senior Environment Officer, Development Assessment
Council Senior Development Engineer, provided the following in an internal memo:
Engineering has identified unresolved issues relating to stormwater management (allowance for
climate change) and waste collection (vehicle manoeuvring and servicing).
Stormwater Drainage
1. Prior to Council issuing a Development Permit, provide an amended Stormwater
Management Plan and associated Engineering Drawings that incorporates an allowance for
climate change in accordance with Performance Outcome 2 of the Water Quality and
Drainage Code. The amended package must include amendments to Engeny’s Stormwater
Management Plan and associated Engineering Drawings prepared by TOD Consulting, be
prepared by a suitably qualified person (RPEQ), and include in particular:
Page 14 of 18
Document Set ID: 23672855
Version: 9, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24/0125 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.