               This outcome is not supported and must be addressed as part of the conditions of this preliminary
               approval.
               Waste Management Code
               Acceptable Outcome AO1.1 and AO1.2 of the Waste Management Code state:
               AO1.1          Construction, operational and demolition works are planned and managed in
                              accordance with Planning Scheme Policy PSP9 Waste management.
                              Editor’s Note— PSP9 Waste Management requires Waste Management Plans to be
                              prepared as part of certain types of development applications to ensure proper
                              consideration is given to waste minimisation, segregation and reuse.
               AO1.2          Adequate area is provided on-site for the collection and separate storage of recyclable,
                              non-recyclable, vegetative and hazardous materials in their specific waste streams
                              during construction or demolition works and the operational phase of development.
               The proposed waste storage areas do not meet the requirements of these Acceptable Outcomes
               of the code. The proposal is therefore required to comply with corresponding Performance
               Outcome PO1 of the Waste Management Code, which states:
               PO1            Development that generates several classes of waste is designed so waste is
                              collected, stored and disposed of in a safe and ecologically sustainable manner.
               The proposed development did not demonstrate compliance with PSP9 Waste Management, and
               the applicant did not provide a Waste Management Plan demonstrating that all waste servicing
               and collection can occur onsite.
               The refuse/recycling areas associated with the development must occur in locations that minimise
               the amenity impact on adjacent properties.
               The submitted information for the provision of onsite servicing did not demonstrate that a Refuse
               Collection Vehicle could enter and exit the site in a forward gear while remaining wholly within the
               access driveway (i.e., the access handle to Starboard Avenue).
               Council’s Senior Development Engineer has also considered the proposed waste solution and has
               provided advice in his assessment below.
               The outcome proposed by the applicant is not supported and must be addressed as part of the
               conditions of this preliminary approval.
               4.     CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •   Senior Development Engineer, Development Assessment
               •   Senior Environment Officer, Development Assessment
               Council Senior Development Engineer, provided the following in an internal memo:
               Engineering has identified unresolved issues relating to stormwater management (allowance for
               climate change) and waste collection (vehicle manoeuvring and servicing).
                      Stormwater Drainage
               1.     Prior to Council issuing a Development Permit, provide an amended Stormwater
                      Management Plan and associated Engineering Drawings that incorporates an allowance for
                      climate change in accordance with Performance Outcome 2 of the Water Quality and
                      Drainage Code. The amended package must include amendments to Engeny’s Stormwater
                      Management Plan and associated Engineering Drawings prepared by TOD Consulting, be
                      prepared by a suitably qualified person (RPEQ), and include in particular:

                                                                                                       Page 14 of 18

Document Set ID: 23672855
Version: 9, Version Date: 08/04/2025

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU24_0125 (As Published).pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.