Delegated Report - Code - Planning MCU24/0125 (As Published)
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and lodged with Council by 1 April 2027, unless an application to extend the
currency period is approved by Council.
Stormwater Drainage
3. Prior to Council issuing a Development Permit, provide an amended Stormwater
Management Plan and associated Engineering Drawings that incorporates an allowance for
climate change in accordance with Performance Outcome 2 of the Water Quality and
Drainage Code. The amended package must include amendments to Engeny’s Stormwater
Management Plan and associated Engineering Drawings prepared by TOD Consulting, be
prepared by a suitably qualified person (RPEQ), and include in particular:
3.1. allowance for a 20% increase in rainfall intensity by the year 2100 for all modelled
scenarios (10% and 1% AEP event);
3.2. a revised assessment of non-worsening based on like-for-like scenarios for climate
change scenarios, based on the 1% AEP event (2100);
3.3. revised internal site drainage drawings and calculations to include a climate change
allowance; and
3.4. additional detail demonstrating how the “gap flow” has been calculated – nothing that
Section 4.1 of the Stormwater Management Plan suggests that development flows in
excess of the pipe network fail to report to the existing bioretention basin in Ely Street.
Waste Management
4. Prior to Council issuing a Development Permit, provide a Waste Management Plan
demonstrating that all waste servicing and collection is to occur onsite. The Waste
Management Plan must be prepared by a suitably qualified person and include, in particular:
4.1. onsite collection of refuse/recycling must be undertaken using 1,100 litre, low-noise
waste containers – waste servicing, include the storage of waste containers, must
occur in locations that minimise the amenity impact on adjacent properties.
4.2. provision for on-site servicing by a Refuse Collection Vehicle (i.e., Dennis Eagle Elite
2 6x4 with rear lift configuration) – the Refuse Collection Vehicle must be able to enter
and exit the site in a forward gear while remaining wholly within the access driveway
(i.e., the access handle to Starboard Avenue).
4.3. If a Refuse Collection Vehicle is unable to remain wholly within the access driveway,
provide a revised development layout that accommodate on-site manoeuvring of a
Refuse Collection Vehicle; and
4.4. Compliance with The Noosa Plan 2020 – Waste Management Code and PSP9 Waste
Management.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Page 17 of 18
Document Set ID: 23672855
Version: 9, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24/0125 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.