RFI - Email from RPEQ Structural Engineer
Liam Pinese <[email protected]>
Email from RPEQ Structural Engineer
1 message
Liam Pinese <[email protected]> 26 March 2026 at 10:34
To: Liam Pinese <[email protected]>
Hi Liam,
From a structural engineering perspective, the development of basement and foundation design is
inherently a top-down process. The structural system, including piling size, depth, and alignment, is
governed by the building loads, geotechnical conditions, groundwater profile, and construction
methodology. The development of basement and foundation design requires significant input from
specialist consultants and is typically progressed only once there is a reasonable level of planning
certainty. Proceeding to this level of detail prior to development approval would result in unnecessary
cost and potential rework, should the proposal not be supported in its current form. it is not typical
practice to issue detailed foundation design or “concept” structural documentation for planning
assessment purposes.
Notwithstanding the above, we can provide some high-level commentary to assist Council in
understanding the likely outcomes:
It is standard industry practice for structural foundations (including piles, pile caps, and retaining
elements) to extend within prescribed setback areas. Planning controls generally relate to built
form and amenity outcomes above ground, rather than subsurface structural elements required to
support the development.
Even for typical residential construction, it is common for footings, strip foundations, and retaining
wall systems to encroach significantly into setback zones. This is not unique to this calibre of
development.
In many cases, conventional boundary treatments such as masonry or block fences require footing
systems in the order of 500–600mm in width to achieve adequate lateral stability under wind
loading. By comparison, a piled solution—while more costly—can achieve equivalent or superior
structural performance with a smaller footprint at ground level.
Accordingly, locating piled elements closer to the boundary can, in fact, improve the available clear
width for landscaping when compared to traditional footing systems.
In relation to the 1.5m “deep planting” requirement:
Achieving a completely obstruction-free subsurface zone is not consistent with typical engineering
or construction practice, particularly for developments incorporating basements.
The site conditions, including a tidal saline groundwater table, will also impose practical limitations
on the viability of deep planting within this zone, irrespective of foundation encroachment.
It should also be noted that standard boundary fencing solutions will necessarily occupy a portion
of this setback. Clarification would be appreciated as to whether Council’s interpretation would
preclude typical fence footings within this area.
In addition to the above 3 points above, it is also poor building practice to plant tree whose mature height
is within the same distance to dwelling as per the recommendations of AS2870-2011-Residential Slabs
& Footings and CSIROS guideline on foundation maintenance & footing performance, so any
landscape planting should be limited to smaller shrubs with shallower root systems, rather than deep
rooted planting which would also adversely impact the adjacent neighbouring properties.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
If required, we can investigate alternative retention systems (e.g. sheet piling) that may allow for
selective removal or modification of structural elements within the setback zone. However, It should be
noted that the currently proposed CFA (continuous flight auger) piled solution represents a premium
construction methodology, specifically selected to minimise ground vibration and reduce the risk of
damage to adjoining structures. While sheet piling may achieve a reduced structural footprint within the
setback, it inherently requires vibratory or impact-driven installation methods, which introduce a higher
risk of ground disturbance and potential impacts to adjacent properties.
Regards,
Tom Harrington
(07) 5455 5604
1/11 Project Avenue, Noosaville, QLD, 4566
PO Box 1661, Noosa Heads, QLD, 4567
scg-engineers.com [email protected]