Original source · versioned page text
RFI - Email from RPEQ Structural Engineer
If required, we can investigate alternative retention systems (e.g. sheet piling) that may allow for
selective removal or modification of structural elements within the setback zone. However, It should be
noted that the currently proposed CFA (continuous flight auger) piled solution represents a premium
construction methodology, specifically selected to minimise ground vibration and reduce the risk of
damage to adjoining structures. While sheet piling may achieve a reduced structural footprint within the
setback, it inherently requires vibratory or impact-driven installation methods, which introduce a higher
risk of ground disturbance and potential impacts to adjacent properties.
Regards,
Tom Harrington
(07) 5455 5604
1/11 Project Avenue, Noosaville, QLD, 4566
PO Box 1661, Noosa Heads, QLD, 4567
scg-engineers.com [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.