         WBNM WHOLE OF SITE DETENTION SUMMARY
          Pre-Development      Post-Development
 AEP                                                                  Performance
         Q (m 3/s)    Duration (min)    Q (m 3/s)    Duration (min)
63.20%        0.021              15          0.013              15           62%
39.35%        0.029              15          0.027              15           93%
18.14%        0.039              15          0.039              15          100%
 10%          0.049              10          0.046              15           94%
 5%            0.06              10          0.052              15           87%
 2%           0.067              10          0.064              10           96%
 1%           0.074              10          0.074              10          100%

           RATIONAL METHOD - WBNM CALIBRATION
         Pre-Development RM            Pre-Development WBNM
 AEP          3
                                                                      Difference
         Q (m /s)     Duration (min)    Q (m 3/s)    Duration (min)
63.20%         0.02                5         0.021              15          105%
39.35%        0.027                5         0.029              15          107%
18.14%        0.038                5         0.039              15          103%
 10%          0.046                5         0.049              10          107%
 5%           0.054                5          0.06              10          111%
 2%            0.07                5         0.067              10           96%
 1%            0.08                5         0.074              10           93%

           RATIONAL METHOD - WBNM COMPARSION
         Pre-Development RM            Post-Development WBNM
 AEP          3
                                                                      Difference
         Q (m /s)     Duration (min)    Q (m 3/s)    Duration (min)
63.20%         0.02                5         0.013              15           65%
39.35%        0.027                5         0.027              15          100%
18.14%        0.038                5         0.039              15          103%
 10%          0.046                5         0.046              15          100%
 5%           0.054                5         0.052              15           96%
 2%            0.07                5         0.064              10           91%
 1%            0.08                5         0.074              10           93%


[OCR of page images]
WBNM WHOLE OF SITE DETENTION SUMMARY

ie Pre-Development Post-Development
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.021 15 0.013 15
39.35% 0.029 15 0.027 15
18.14% 0.039 15 0.039 15
10% 0.049 10 0.046 15
5% 0.06 10 0.052 15
2% 0.067 10 0.064 10
1% 0.074 10 0.074 10
RATIONAL METHOD - WBNM CALIBRATION

er Pre-Development RM Pre-Development WBNM
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.02 5 0.021 15
39.35% 0.027 5 0.029 15
18.14% 0.038 5 0.039 15
10% 0.046 5 0.049 10
5% 0.054 5 0.06 10
2% 0.07 5 0.067 10
1% 0.08 5 0.074 10

RATIONAL METHOD - WBNM COMPARSION

ie Pre-Development RM Post-Development WBNM
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.02 5 0.013 15
39.35% 0.027 5 0.027 15
18.14% 0.038 5 0.039 15
10% 0.046 5 0.046 15
5% 0.054 5 0.052 15
2% 0.07 5 0.064 10
1% 0.08 5 0.074 10

Performance

62%
93%
100%
94%
87%
96%
100%

Difference

105%
107%
103%
107%
111%

96%

93%

Difference

65%
100%
103%
100%

96%

91%

93%

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Appendix D- Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.