Council archive · source document
Information Request [As Published] · 142008.658
B. Water main in road 1 to be extended from Lot 4/5 boundary along southern
side of road to Lot 3 boundary to facilitate connection to possible future
development of abutting allotment. Road crossing (2) to be deleted.
C. Sewerage design adjacent to proposed retaining walls where sewer invert is
below bottom of wall is not acceptable (i.e. Sewer Line 6). Please discuss
options to modify design to suit council requirement with Council’s Water
Supply and Sewerage Works Manager, Northern Division, Mike Froude
(phone 5449 5288) prior to submitting amended drawings.
D. All HCB’s to be specified as 150mm diameter and be 1.5m deep.
E. Sewer lines 13 and 14 to be regraded to provide for 1.5m HCB depth.
F. Note 3 to be amended to refer to “Council” in lieu of “Shire Engineer”.
G. All notes to replace reference to NSC with SCRC.
Kevin Slender
Technical Assessment Officer
IMPORTANT AND LEGAL PRIVILEGE NOTICE:
The information contained in this facsimile message is CONFIDENTAL and may be subject to legal privilege. If you are not
the intended recipient, you are notified that any use of this message is prohibited. If you received this message in error,
please notify us immediately by telephoning 07 54495200 and destroy the original.
Page: 2 of 2
Original to follow: No
Sunshine Coast Regional Council Tewantin Office 9 Pelican Street TEWANTIN (PO Box 141 TEWANTIN 4565)
Ph 07 5449 5200 Fax 07 5447 1062
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 34 KB (small file)
- File type
No other editions are linked here.