2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Annual Asset Renewal Costs Sea Water Supply Pump Station
(SWSPS)
Sand Pumping Station (SPS)
$200,000.00
$180,000.00
$160,000.00
$140,000.00
$120,000.00
$100,000.00
$80,000.00
$60,000.00
$40,000.00
$20,000.00
$-
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Figure 5: SRS Asset Replacement Costs
Furthermore, the graph below identifies the cumulative costs and future investment required in
renewing assets over a 10 year period. These renewals are identified in Councils 5 -10 year
Capital Works Program.
Cumulative Renewal Costs
500000
450000
400000
350000
300000
250000
200000
150000
100000
50000
0
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Renewal Renewal Cumulative
Figure 6: SRS Cumulative Asset replacement Costs
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 14