Original source · versioned page text
2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.8 Capital Upgrades and New Assets There are no short-term plans for upgrades and expansion of the SRS assets. It has not been determined if the facility has the capacity to expand and cater for any additional locations within a suitable proximity should the need arise. The ongoing monitoring of sand renourishment and beach erosion activities will form the business case for any future expansion of the SRS operations. 4.9 Capitalisation of Assets All new and renewed assets will be acquired and commissioned in accordance with the Noosa Council Capital Delivery Framework. 4.10 Disposal and Replacement of Assets Disposal of assets will be consistent with statutory and regulatory requirements. The replacement of assets will be driven from the condition assessments. The disposal and commissioning of assets from the asset register is undertaken in the capitalisation and asset write-on/off process. This process is being delivered via the Asset Management Branch and Finance Branch. Asset Management Plan: Noosa Main Beach Sand Recycling System Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.