2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5. Risk Management
Risk management is a coordinated approach to the management and control of risk by Noosa
Council.


5.1      Critical Assets
The identification of critical assets is based on the consequence of failure multiplied by the likelihood
of failure; as adapted from the International Infrastructure Manual 2015 Section 3.2.4. For an
indicative draft table of risk measures refer to Councils Risk Matrix in Council’s Corporate Risk
Register.


5.2      Risk Assessment
It is important to have a good understanding of the risks associated with the operations of the SRS.

The top four asset related risks are:
1.    Operational Performance – No asset failures when sand renourishment is required after
      significant erosion has occurred from a major weather event.
2.    Contract Management
3.    Continuity Planning– the current contract is a construct and operate arrangement. Future
      contracts will need to reflect an ‘operate only’ contract.
4.    Work, Health & Safety - Public Safety – when sand renourishment activities are in-progress.

These risks and all other current risks will be regularly reviewed and if necessary, they can be
documented in the annual Branch Plan – Infrastructure Planning, Design & Delivery. Should the
need for them to be further escalated they can be addressed for consideration by the Risk and Audit
Committee.




Asset Management Plan: Noosa Main Beach Sand Recycling System                                   Page 16
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.