Log in to see the plans as drawn7. Plan Improvement and Monitoring
7.1 Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through TechnologyOne (T1) asset information
management system.
7.2 Improvement Program
The following initiatives are recommended:
1. Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
parent and child assets; at a level of the lowest or appropriate repairable unit. All other
duplicated asset lists/registers should be eliminated. The T1 is the Enterprise Asset
Management Repository. Prior to the revaluation, it is recommended a detailed asset register
and data reconciliation project establishes a single point of truth for asset data within T1.
2. Condition Assessments – Consideration for more detailed and regular condition
assessments, to include all assets other than the pool related assets already assessed.
Investigate the potential for implementing regular electronic condition assessments on mobile
devices for use in a formal renewal plan and improve record keeping.
Condition assessments for the underwater infrastructure that supports the SRS should be
incorporated in future condition inspection routines.
3. Contract Management – In respect of the SRS contract, it is recommended that a formal
contract plan be developed outlining procedures and allocating various staff responsibilities for
optimal management of this contract covering key aspects including operational performance
(and desired beach profile), Safety matters, business continuity, review of invoices,
communications and reporting etc.
4. Business Continuity Planning – Management has identified the need to develop a strategy
beyond the current operating contract. The current contractor has the specialist knowledge of
the facility and a need to build and document operational activities for future contracts is critical
to the management of the facility. There are potential impacts on future operations due to the
intellectual property of the existing contractor that must be addressed over the next 3 years,
well in advance of the expiry of the current contract to ensure a smooth transition into the next
contract period.
5. Asset Systems – There is no implementation of operational work orders for reactive work or
inspections to date. There is a number of functions of the T1 system that would improve the
operational and maintenance activities and further improve the asset management objectives
of the organisation. These include:
i. Planned maintenance work orders;
ii. Costings via work orders;
iii. Inspections and defects logged within T1;
iv. Asset performance reporting from T1.
6. Renewal and Maintenance Plans – Plans must be regularly reviewed and incorporated into
the annual budget process. Continued inspections and recording of asset condition and
maintenance activities are key to achieving this initiative.
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.