2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Frequency
CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
HV- HV- Bypass Check
016 016 Valve Valve Run to failure 0 0 $ - $ -
HV- HV-
017 017 Bypass Valve Valve Run to failure 0 0 $ - $ -
HV- HV-
019 019 Drain Valve Valve Run to failure 0 0 $ - $ -
HV- HV- Slurry Sump
021 021 Drain Valve Valve Run to failure 0 0 $ - $ -
HV- HV- Isolation Valve
022 022 for beach hose Valve Run to failure 0 0 $ - $ -
High Pressure
Line to Slurry
Sump Intake
Line Control
Valve Bypass
1038 1038 Isolation Valve Valve Run to failure 0 0 $ - $ -
High Pressure
Line to Slurry
Sump Intake
Line Control
Valve Bypass
1039 1039 Check Valve Valve Run to failure 0 0 $ - $ -
Slurry Sump
Lighting (on
slurry sump
1040 1040 platform) Lighting Run to failure 0 0 $ - $ -
PIT- PIT- Pressure
003 003 Transmitter Instrument Run to failure 0 0 $ - $ -
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 34