2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Camera - Beach
Discharge
1024 1024 Camera Camera Run to failure 0 0 $ - $ -
Camera No.2 -
Inside Building
1025 1025 No.1 Camera Run to failure 0 0 $ - $ -
Camera No.3 -
Views Slurry
1026 1026 Slump camera Run to failure 0 0 $ - $ -
Camera No.4 -
Views Beach
1027 1027 Intake Camera Run to failure 0 0 $ - $ -
Building No.1
Internal
1028 1028 Lighting Lighting Run to failure 0 0 $ - $ -
Sand Pump
Station
External Area
Lighting
(External
lighting on
1029 1029 Building No.1) Lighting Run to failure 0 0 $ - $ -
Slurry Pump
Discharge
1030 1030 Bellow Bellow Run to failure 0 0 $ - $ -
Cables and
1031 1031 Cable Trays Cable Run to failure 0 0 $ - $ -
HV- HV-
015 015 Drain Valve Valve Run to failure 0 0 $ - $ -
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 33