Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
12. ANNEX E: SRS Asset Renewal Program
 Asset Id    Asset Type                                         Install Date   CA      CA          CA            Indicitive
 No.                                                                           Score   Estimated   Assessment    Replacement
                                                                                       Remaining   Replacement   Cost
                                                                                       Life        Year
 10-SP2      Sea Water Supply Pump Station (SWSPS)              12/08/2008     4       5           14/12/2022    $10,900
 1015        Sand Pumping Station (SPS)                         12/08/2008     4       6.25        14/12/2023    $9,500
 10-WP1      Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       11          14/12/2028    $85,000
 HV-018      Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       13.75       14/12/2030    $6,200
 1003        Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       5.5         14/12/2022    $5,500
 1005        Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       13.75       14/12/2030    $15,000
 1006        Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       13.75       14/12/2030    $20,000
 1050        Sea Water Supply Pump Station (SWSPS)              12/08/2008     3       11          14/12/2028    $35,000
 1014        Sand Pumping Station (SPS)                         12/08/2008     3       5.5         14/12/2022    $3,000
 1018        Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $9,500
 1023        Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $40,000
 LCV-005     Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $3,600
 UV-010      Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $6,300
 UV-011      Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $3,970
 HV-016      Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $1,500
 1039        Sand Pumping Station (SPS)                         12/08/2008     3       13.75       14/12/2030    $1,500
 10-SU1      Sand Pumping Station (SPS)                         12/08/2008     3       22          14/12/2039    $200,000
 1040        Sand Pumping Station (SPS)                         12/08/2008     3       5.5         14/12/2022    $2,000
 1001        Sea Water Supply Pump Station (SWSPS)              11/01/1900     2       40          14/12/2057    $1,500,000
 1002        Sea Water Supply Pump Station (SWSPS)              12/08/2008     2       20          14/12/2037    $3,500
 1004        Sea Water Supply Pump Station (SWSPS)              12/08/2008     2       16          14/12/2033    $15,000
 1007        Sea Water Supply Pump Station (SWSPS)              12/08/2008     2       40          14/12/2057    $30,000
 FSL-024     Sea Water Supply Pump Station (SWSPS)              12/08/2008     2       12          14/12/2029    $1,000
 1009        Sea Water Supply Pump Station (SWSPS)              12/08/2008     2       24          14/12/2041    $45,000

Asset Management Plan: Noosa Main Beach Sand Recycling System                                                           Page 36
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.