Original source · versioned page text
2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Asset Id Asset Type Install Date CA CA CA Indicitive
No. Score Estimated Assessment Replacement
Remaining Replacement Cost
Life Year
10-WP2 Sand Pumping Station (SPS) 12/08/2008 2 16 14/12/2033 $29,500
10-WP3 Sand Pumping Station (SPS) 12/08/2008 2 16 14/12/2033 $76,500
10-AC1 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $25,000
1012 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $6,000
1020 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $7,500
1022 Sand Pumping Station (SPS) 12/08/2008 2 24 14/12/2041 $3,000
1024 Sand Pumping Station (SPS) 12/08/2008 2 8 14/12/2025 $3,000
1025 Sand Pumping Station (SPS) 12/08/2008 2 8 14/12/2025 $3,000
1026 Sand Pumping Station (SPS) 12/08/2008 2 8 14/12/2025 $3,000
1027 Sand Pumping Station (SPS) 12/08/2008 2 8 14/12/2025 $3,000
1029 Sand Pumping Station (SPS) 12/08/2008 2 8 14/12/2025 $4,500
1031 Sand Pumping Station (SPS) 12/08/2008 2 24 14/12/2041 $25,000
UV-001 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $3,820
UV-004 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $6,200
UV-008 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $3,820
HV-015 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
HV-017 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
HV-019 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
HV-021 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
HV-022 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
1038 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $1,500
10-KS1 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $3,500
10-KS2 Sand Pumping Station (SPS) 12/08/2008 2 20 14/12/2037 $3,500
FIT-012 Sand Pumping Station (SPS) 12/08/2008 2 12 14/12/2029 $10,000
LIT-009 Sand Pumping Station (SPS) 12/08/2008 2 12 14/12/2029 $5,500
PIT-003 Sand Pumping Station (SPS) 12/08/2008 2 12 14/12/2029 $7,500
PIT-006 Sand Pumping Station (SPS) 12/08/2008 2 12 14/12/2029 $7,500
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 37
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.