Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Asset Id    Asset Type                                         Install Date   CA      CA          CA            Indicitive
 No.                                                                           Score   Estimated   Assessment    Replacement
                                                                                       Remaining   Replacement   Cost
                                                                                       Life        Year
 10-WP2      Sand Pumping Station (SPS)                         12/08/2008     2       16          14/12/2033    $29,500
 10-WP3      Sand Pumping Station (SPS)                         12/08/2008     2       16          14/12/2033    $76,500
 10-AC1      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $25,000
 1012        Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $6,000
 1020        Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $7,500
 1022        Sand Pumping Station (SPS)                         12/08/2008     2       24          14/12/2041    $3,000
 1024        Sand Pumping Station (SPS)                         12/08/2008     2       8           14/12/2025    $3,000
 1025        Sand Pumping Station (SPS)                         12/08/2008     2       8           14/12/2025    $3,000
 1026        Sand Pumping Station (SPS)                         12/08/2008     2       8           14/12/2025    $3,000
 1027        Sand Pumping Station (SPS)                         12/08/2008     2       8           14/12/2025    $3,000
 1029        Sand Pumping Station (SPS)                         12/08/2008     2       8           14/12/2025    $4,500
 1031        Sand Pumping Station (SPS)                         12/08/2008     2       24          14/12/2041    $25,000
 UV-001      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $3,820
 UV-004      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $6,200
 UV-008      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $3,820
 HV-015      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 HV-017      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 HV-019      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 HV-021      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 HV-022      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 1038        Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $1,500
 10-KS1      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $3,500
 10-KS2      Sand Pumping Station (SPS)                         12/08/2008     2       20          14/12/2037    $3,500
 FIT-012     Sand Pumping Station (SPS)                         12/08/2008     2       12          14/12/2029    $10,000
 LIT-009     Sand Pumping Station (SPS)                         12/08/2008     2       12          14/12/2029    $5,500
 PIT-003     Sand Pumping Station (SPS)                         12/08/2008     2       12          14/12/2029    $7,500
 PIT-006     Sand Pumping Station (SPS)                         12/08/2008     2       12          14/12/2029    $7,500


Asset Management Plan: Noosa Main Beach Sand Recycling System                                                              Page 37
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.