Original source · versioned page text
information request mcu14.0039
MCU14/0039 (iii) Waste vehicles are side loading for 240 litre wheelie bins. Water Supply 13 Water for the cultivation use is currently being sourced from the adjoining property at 271 Lake Macdonald Drive. Please provide evidence that the appropriate licences have been obtained to extract the quantity of water required for the development. Please also provide a statement from a suitably qualified person, as to the reliability of the water source and how the use avoids adverse impacts on the surrounding or downstream environments or natural environmental processes. Unitywater 14 If connection to the Unitywater water network is proposed, then a network analysis is to be performed and submitted to Unitywater for assessment. The analysis must be prepared by a suitably qualified and experienced consulting engineer and must demonstrate: (a) The impact of this development on the external water supply systems with reference to the requirements of the current Unitywater’s Desired Standards of Service. Analysis must be undertaken for existing and all applicable future planning horizons. (b) The internal main’s compliance with the current Unitywater’s Desired Standards of Service for all applicable future planning horizons. (c) Acceptable solutions where non-compliance to the current Unitywater Desired Standards of Service occur (including identification of infrastructure size/configuration/timing changes to Unitywater 'planned' infrastructure). The report must provide details of the proposed water supply demands of this development for all proposed development staging/timings, where applicable. Network analysis results must be presented in tabular and graphical formats as detailed in the Unitywater Desired Standards of Service document. Contact Unitywater “Strategic Infrastructure Planning” department for information or advice pertaining to preparation of network analyses. End of Information Request Under the provisions of the Sustainable Planning Act 2009, you have three options available in response to this Information Request. You may give the assessment manager (in this instance Council) and each referral agency (if any): (a) all of the information requested; or (b) part of the information requested together with a letter asking the assessment manager and each referral agency to proceed with the assessment of the application; or (c) a letter; (i) stating that you do not intend to supply any of the information requested; and (ii) asking the assessment manager and each referral agency to proceed with the assessment of the application. Please be aware that under Section 279 of the Sustainable Planning Act 2009, the applicant must respond to the Information Request within 6 months of the request or otherwise, the application lapses. You may wish to follow the progress of this application online at www.noosa.qld.gov.au. Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.