Original source · versioned page text
information request mcu14.0039
MCU14/0039 seeks new uses are designed and maintained to avoid significant adverse acoustic impacts on the surrounding premises. Breach action has resulted in the enclosure of the generator to reduce the noise levels from the site. Please provide details as to the short and long-term intentions to provide power to the site. Acoustic Report 10 An acoustic report prepared by a suitably qualified person is required. The acoustic report is to address all existing and potential noise sources from the proposed development and demonstrate that - (a) mechanical equipment such as the generators, ventilation, air conditioning, refrigeration, ventilation fans, plant rooms, refuse compactors and pumps etc; and (b) vehicle movements from waste collection activities and delivery/collection of goods (including refrigerated vehicles, engine noise, fork lifts, compactors etc) to the packing areas will not cause an environmental nuisance to the existing surrounding residential areas of the development. Noise emissions are to comply with the noise requirements under the Environmental Protection Act 1994. 11 The acoustic report should include (as a minimum): the location of any plant and associated equipment; measured and predicted noise levels (in particular at residential areas); acoustic treatments/screening proposed (in particular for the generator shed) and alternatives to noisy equipment etc. to eliminate the existing noise nuisance during night time hours and mitigate noise from delivery and waste vehicles and associated activities. Waste Management 12 A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-day operation of the development. The Plan should include the following information as a minimum: (a) The types of waste that will be generated from the activities approved within the development. (b) Estimated volumes or tonnage of both recyclables and waste generated. (c) Methods to be used for dealing with any green waste. (d) Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. (e) Description of procedures for getting all waste to the bins; the storage of bins and the collection of bins by the contractor. (f) A description of the design details of waste storage and recycling areas including size, location, elevation, enclosure/s, floor plan and methods of bin washing that prevent contamination of storm water and an appropriately sized bin wash area drained to sewer. (g) A description of types and volume of waste storage containers to be used. (h) The waste and recycling storage area should include the provision of correctly sized containers for all waste and recycling materials including putrescible matter, non-recycling waste, paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to sewer. (i) A detailed description of the waste vehicle access to collect waste including vehicle turnarounds that allow vehicles to enter and leave the site in a forward direction. It should be noted that: (i) Waste vehicles are front loading for steel 1.5 to 3m3 bins; (ii) Waste vehicles are rear loading for plastic low noise 1.1m3 bins; and Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.