Council archive · source document
response to information request - 38 mossman 21.05.24 · MCU24/0032
12. Provide updated Engineering Plans prepared by a suitably qualified person.
The updated plan must reference the proposed development plans.
Updated engineering plans are provided by SCG engineers. ADG engineers also provide
the following email correspondence relating to the dewatering plan.
From: Michael Campbell [email protected]
Sent: Thursday, May 16, 2024 9:50 AM
To: Tom Harrington [email protected]
Subject: RE: 38 Mossman Court
Hi Tom,
I can confirm that I have now reviewed the latest basement floor plan layout (ref. Project Number
2401, Drawing Number 02 DA04) and compared it against the previous iteration used for
reference purposes in preparing the DMP for 38 Mossman Crt, Noosa Sound (refer DMP Appendix
C).
I can also confirm that the proposed floorplan layout changes in no way affect the extent or depth
of excavation, and therefore will have no effective impact (no change) to the temporary
construction dewatering requirement for this project to enable construction in dry conditions. As
such, we confirm there is no need to amend the DMP to reflect the proposed floor plan layout
change.
If you require further information or clarification, please don’t hesitate to let me know.
Cheers, Michael.
Michael Campbell
BEnvSc, BSc[Hons], DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
MEIANZ, MALGA, MSSA
Director & Principal Environmental Scientist
M 0415 960 372
P 07 3801 1564
E [email protected]
W adgconsulting.com.au
---------------------------------------------------------------------------------------------------------------------
Page 4 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to information request - 38 mossman 21.05.24.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.