Council archive · source document
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744
COURT BLUEFIN DRIVEWAY CROSS OVER DETAILS TO BE IN ACCORDANCE WITH NOOSA SHIRE COUNCIL'S STD DRAWINGS 9005 & 9019. SITE DRAINAGE ~ CONSTRUCTION ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS TOWARDS THE CENTRE OF THE ALLOTMENT THEN TOWARDS THE ROAD FRONTAGE WHERE RUNOFF WILL DRAIN THROUGH THE SILT FENCES. IN NO INSTANCE SHALL THE ALLOTMENT ORAIN INTO NEIGHBOURING ALLOTMENTS. ‘DOCUMENTATION ORAINAGE OF NEIGHBOURING PROPERTIES IN ACCORDANCE WITH HYDRAULICS CONSULTANTS 900(W) GEO-FABRIC SLT FENCE, FIXED TO SPKES AND BURIED 300 INTO STABLE GROUND. Revision | Description : xe 90°01'20 NEW BLOCK BOUNDARY WALL (REFER SECTION) ms z Ny A > 1 30.30 a Wo IES a se siT— — S Pp 1200(L) 50 Sq. Howo sees, \I-=ITI7| : 1800 ctre DRIVE 600 INTO 4 UNE OF PROPOSED DRIVEWAY & GROUND. = v g Ew 8 [ oad 3 Lu FENCE IL s UNE OF PROPOSED DUPLEX . a CREATE BUNDING IN Ro Lu Zu TEMPORARY HAROSTAND She s FOR DIVERISION INTO Sis YX e | SILT FENCES. = “” g SI Ke, % 2 2 2 H 4 oS 3 = = NO COMPATION EQUIPMENT ¥ 606m? a s VANI2 Top ADNACENT BOUNDARY WALL 5 WY eS s° 4 TT] cose 0 Ue ¥ ow é 190 Block - core filed bess S 4 s ° NI2 bors @ 400 cir. PROWDE FULL HT. é F.F.L. - RL 2.60m y = vert, 400 ctre hort ' MOVEMENT JONTS AT eS Li, LZ 5 zZ = lop bors 500mm, »(y Bom CTRS z Al cores cleared before | H = pour via dean-out a 3 blocks, | Nc B OQ 3 NN | > 5 Goroufo. = Se , eB 2S : 20~40mm AGGREGATE a =~ Bi eg HARD STAND OVERLAY = Le = = wih ogi pipe to | | FoR DeLVERY's ouRIG = 5 |} =] outit. 3 s onsen Wy ele \ 150 Thk Heel SLB2 3/, z £ le | mesh top 40 cover. 2 % re] ft eo 5 S hy YX 1200 | 800 Noumionn Steel NS7a g z S 800 | 600 cage (2/010 top, Vv 500_| 200 300 8 4/10 bottom) \ “y_UNE OF PROPOSED OUPLEX FEM] pl oe J 30,30 4 SECTION ~ BLO Se Ss s a SZ-Y + 2 ae NEW BLOCK BOUNDARY WALL (REFER SECTION) “ne < 270°01'20" o> wy ie SITE PLAN — OPERATIONAL WORKS NS ~ © Scale 1: 100 ¥ > NO v CONSTRUCTION NOTES . GENERAL: Fen te hs acped dato ol xpaie matt ont dt. . 4 Os nat see frm ths crow = he abd to be ol red iho vr tel un ae to eee ran be nprned nein Cope O . 3. Setting out dmensions are to be obtained from the architectural bars iain se re eee thes pa nn ad ts erored aezardance with ASZETO-1996 to achieve 0 minimum retative field density ue ha DRAWING?SIZE AQ ene ‘ i Perth Said Penstremeter for 9 depth of 1.0m belog ext level. Copies = Site drohoge ond alt protection measures must be istoled prior to oN pee wo 4 Any docrepances between these towing and the aitecird drovngs ‘of compaction test results shcB be presented to SOG Consiting Engineers eeu ee " Fae approved. % - ~ imitactecctaemncer™ | Si Srararri aster sc NN es ane ed tp nee SUE FOR; APEROVAT cceardance vid the ottched ofted depth Ene Goxyon. Engeers the clotmant i to be Gad to the speciied evel. to level. Any ocganle matter or debris is to be removed ond replaced sith be FOOTPATHS AND DRIVEWAYS: ~ The 11 motered dean grr meri (Le. sand to 0 dey amd fr approves compacted moterik The subgrade sdk be prof ruled to a CONSULTING _ ENGINEERS Essig to remo cecardence with S726) We ee Cee ea minimum of SB% dry densty as dxtamined by campacon testhg S sirucizval - elvil - geotechnical Conti ae tl dept ke eomercd whies cantent of tess thn 12% (Rsteiy Wex ess than 25%, Urea shige of cvoardonce with ASI289 ABN 40 098-481 690. ‘exuding any Mhished 15%}. The proposed mated is inspected by SOS Consulting Engneers. 2 Pavement materids sho comply with the following main roads LEGEND oy to Be 125mm ” ‘eciments Prior to ita removd to ensure fis compatabbty, Gepartment specification WS11.06 U1/11 PROJECT AVENUE, NOOSAVILLE QL0.4566 + EXISTING SURFACE SPOT LEVELS. tolerance +.0mm over 3.0m oocordance with AS 1379 and AS 3600 to AS 1304, sid LL Ft as a be 10mm wide wet tocded with every PRPAN OMAR Ee Expansion jpints to wet mesh wre it clang pint. ‘Qhe cocess point permitted for each dlotment. For aurved driveways, reaxmum grades apply to inside edge of curve 40. AN services to be located and protected os required priar to work — The fi Is to be ploced ond compocted in accordance with AS793-1996 to a level sufficient to achieve @ Level 1 certificotion with o minimum redative fidd density of 95% Copies of compoction test results shal be presented to SCG Conséting Engineers for approval, = Filing ond campocting odjpeent existing structures is to be in strict + Areas where existing structures or teee cre removed shall be bockflled ‘with the approved fal moteridl compocted in accordance with AS2870-1996. to ochieve o minimum relathe field density of 95% ~ Base course to consist of aggregate type 23, Grading B or C aver id shall be extended o minimum of 150mm beyond the a mhimom of 100mm thick UNO. 4. Bose ond sub-bose courses are to be compacted fr layers not exceeding 150mm in thickness to achieve 95% dry density or greater with i i i Ph (07) 5455 5604 Fax (07) 5455 5696 Title: OPERATIONAL WORKS PLAN. Project Lot 2/5 Bluefin Court NOOSAVILLE Date: April 2008. Drg No. 18095-OW1) *
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.