Council archive · source document
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744
5 BLUEFIN COURT NOOSAVILLE FOR VYNARA P/L GENERAL NOTES Water Supply and Sonitory Drainage hos been designed ond sholl be constructed in ew indard Water Supply Low. ITARY ORAINAGE ‘ground pipewort sholl be 100 dia, PE DWV, min grade 1:60 U.N.O. .aded Pipewors shall ba PVC closa OW. worta pipework to ‘wap suspended shall be “Coesprens” ar Underground shal is clay or HOPE, ‘shall be HOPE, or Vitreous cloy with t to surtoce in paves or concrete brass cape, STORMWATER DRAINAGE Underground pipework 150 dio PVC clase SW min grade 1:100 UNO. Downplpes shal be 100 Dio PVC close SW. Rainwater outlets (RWO) ond plonter cutlets (PO) shal be “Cote Wade” or similor, wilh membrane clomp where required, WATER SUPPLY be ot ple ABS (acrylonitrit may uns, (errors ‘max. length 3000 ev. rac, shall be chrome pla ac within tenancies, provide BACKFLOW PREVE! Provide hose connection vacuum bravkare to all howe cocks Jn. medium duty UNO. int [email protected] equal. ¢ keoding condition. Se a Eley 0g ee eg 2 re, POOL TOP UP brigotion ® ne o— i S Hf ev Lev Lew ln Om : cu @-= me Mce @® ‘ Pee g cm « inspection Chomber £ imeeriet ® ie Inapection opening ® oo Inspection Opening ta Surface Pic ERT acer a ee ‘STORMWATER HARVESTING STRATEGY @—— Bye vas Ya ay pene @ Te BO smitng wale o- Pint ‘sala re una “ Be ie hoe co fe, Realy se — WO it nee EwH 2 a ORG Overtion Reket Gully a Water SLAs Do we ‘Coset sw cy = oo ua Loundry tub aug *™ Moening Progr mente eo rw Re Sb Borin Woler supp es = sre Shower FLFR Fire Hove Reel HWS Hot water system TED cs eases st Sy to tomar Lot 2 on RP906911 DRAWINGS 1875-1 - 1875-2 - 1875-3 - 1875-4 - 1875-5 - To be responsibi . To fist all in flow ae ono -as to manufactures spe: —minimum quarterly, -ofter eoch mojor r 5. To inspect and 6. COVER SHEET GROUND HYDRAULIC SERVICES LEVEL 1 HYDRAULIC SERVICES STORMWATER OPERATIONAL WORKS SEDIMENT & EROSION CONTROL PLAN Management ing devices like leaf eaters ters in a: fog of cleaning luding Fist flush storage tank ication but monthly in rainy season b event " To install ond maintoin pump ond fixtures for ; reuse/watering/irrigation as to manufactures specification GENERAL NOTES & LEGEND Site 606m" Roof 242m" Driveway 98m? Tendscope 266m New impervious 340m" CATCHMENT AREAS: alignment and levels infrastructure. it the obligation of the contractor and/or plumbing contractor to survey all existing services prior to construction Note: All kitchen, loundry & bathroom fittings and toilets to comply with the AAA Water Conservation Rating System as defined by AS/NZS6400. Provide flow restrictor volves where necessary to tops and shower exceed a maximum of all existing VYNARA P/L GREG GIBBS ARCHITECTS PROJECT: PROPOSED DEVELOPMENT 5 BLUEFIN COURT NOOSAVILLE DRAMING ‘TILE: roses. The flow shall not of St/min COVER SHEET GENERAL NOTES & LEGEND me 1874-1 newer] RK [oesee] Kara + 1:400, (RPD:— Lot 2 on RP9O6911 [om [11-00-08 waruna| | 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.