Skip to the record
The gold standard in government transparency.

Original source · versioned page text

AJG v NSC - Sealed Judgment - 12.06.26

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

     construction site, through the implementation of appropriate erosion and sediment
     control measures
c.   Works programme identifying key components of the works and their respective
     durations
d.   Establishment of a communication protocol with the general public, adjoining owners,
     emergency services and local businesses to advise of agreed construction times,
     impacts on traffic, services and other relevant issues
e.   Include a post out to the local residents and businesses advising of the proposed
     development, the expected time frames and the site contact details
f.   Include signage in prominent locations on the boundaries of the site advising of the
     proposed development, the expected time frames and the site contact details.
g.   Identification of complaint management procedures including:

       i.  Contact details for the on-site manager
      ii.  Dispute resolution procedures
h. Details of the location of external fill sites / sources, the haulage route, type of vehicle
   to be utilised during filling operations and frequency of usage. NB any damage to the
   existing road system as a result of haulage operations must be repaired at the
   applicant’s expense

i.   It is acknowledged that the preliminary Construction Management Plan will be a draft
     document requiring finalisation upon appointment of the Principal Contractor
     employed to construct the works and a final document will be required to be submitted
     at the Pre-Start Meeting of the project.




                                                                                            11
Log in to download the original file

AJG v NSC - Sealed Judgment - 12.06.26.pdf · 17.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.