Original source · versioned page text
8. Appendix D - Traffic Engineering Report
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
5 TRAFFIC IMPACT
The assessment of the impact of the proposed development on the street network
has been undertaken. The impact has been analysed according to the procedures
set out in Austroads – Guide to Traffic Management and Guide to Road Design.
5.1 Access Intersection Performance
The access driveway with Louis Bazzo Road has been reviewed for operational
performance. The traffic generation from the development during the critical peak
period is shown in Figure 5. The traffic volumes along this section of road are so low
that the access intersection will operate with uninterrupted flow conditions and
detailed traffic modelling is not considered necessary.
Figure 5 - Proposed Development Traffic Distribution (Arrivals)
5.2 Turn Warrants
An assessment of intersection geometry has been undertaken with reference to the
requirements of Austroads Guide to Road Design and Traffic Management. The
access intersection meets the warrants for a Basic Right Turn treatment (BAR) and
Basic Left Turn treatment (BAL) as shown in Figure 6.
Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.